My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1222 14TH ST 2016-01-01 MF Import
>
Address Records
>
14TH ST
>
1222
>
1222 14TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 12:12:26 PM
Creation date
4/4/2017 12:12:15 PM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1222
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 5 <br /> 7. Prepare engineering construction cost esrimates for improvements. <br /> 8. Meet with City staff and Port of Everett representadve and review items 1 thru 7. <br /> R�nonsibilitv of Owner <br /> :. Attend review meeting. <br /> 2. Complete SEPA review. <br /> Task Deliverables <br /> 1. Fioor plans and mechanical configurarion. <br /> 2. Geotechnical Report. - <br /> 3. Equipment information. <br /> 4. Construcaon cost estimate. <br /> �. Minuces from review meeting. <br /> 6. Provide a marimum of three figures ior SEPA review. <br /> III. PUBLIC INVOLVEI�IE�1T <br /> Itesnonsibilities of.En�ineer <br /> This will include involving the public in making decisions related to the aesthetics of Lift <br /> Stauon No. 8. This will include leading two workshop sessions. This anticipates the <br /> inclusion of a screen wall and landscaping to the east of Lifr Station No. 8 in the design. <br /> 1. Prepaze three azchitect renderings of a west elevarion of Lift Station No. 8. <br /> 2. Lead workshop session which will address the following: <br /> • Description of faciliry <br /> • Noise mitigation <br /> • Odor mitiga[ion <br /> • Sc:een wall selection <br /> • Landscaping selection <br /> Res�onsibilitv of Owner <br /> I. Provide invitations to workshop participants. <br /> 2. Arrange (ocation for workshop. � <br /> Task Deliverables <br /> 1. Architectural renderings - West Elevation (3 alternarives - full size) 8 O <br /> ,4lay 1�, 1997 A-? LrfrStatronNos. 7& 8 Upgradu <br />
The URL can be used to link to this page
Your browser does not support the video tag.