My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1222 14TH ST 2016-01-01 MF Import
>
Address Records
>
14TH ST
>
1222
>
1222 14TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 12:12:26 PM
Creation date
4/4/2017 12:12:15 PM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1222
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� _ ___ __ -.. <br /> � _ . <br /> � 15 <br /> N. T�,SK 4: BIDDING ASSIST.�uYCE <br /> ResDonsibilities of En2ineer <br /> 1. Provide one (1) set of bidding documents for reproducdou by City (contract <br /> manual will include 11"x 1T'plans bound in document). <br /> 2. Respond to bidder questians during 3 week bidding period including issuing of <br /> any addenda required. (The City will make dimibution of any addenda). <br /> 3. Attend Prebid Conference. <br /> 4. Prepaze construction cost estimate. _ I <br /> 5. Review conC�actor bids and make recommendation for awazd. <br /> 6. Rebidding of the project as a result of a bid protest is not included in this scooe of <br /> work. <br /> Responsibiliries of Owner <br /> 1. Provide reproduccion of Con�act Documents. <br /> 2. Advenise consuvcticn con�act. <br /> 3. Provide for distribution of the Conu�acc Doc.unenu. <br /> 4. Maintain Plan Holders List. <br /> 5. Nialce distribution of any Addenda. <br /> 6. Hold Prebid Confererce. <br /> VI. TASK 5: CONSTRUCTIO(�i �YAGEMENT <br /> (To be negotiated after completion of Tasks 1-3) <br /> VII. TASK 6: SUPPLEi�1�NT.�,L SE:RVICES <br /> Provide additional engineering services required as directed by the Owner. Prior to <br /> implementation of these se-vices, authorization must be received from tl�e Owner. This <br /> authori2ation will inclu:ie approval of the additional scape of work and the related <br /> budget. <br /> $2 <br /> May 14, 1997 A-4 LiJr Smrion Nos. 7& 8 Upgrades <br />
The URL can be used to link to this page
Your browser does not support the video tag.