Laserfiche WebLink
September 25, 2008 <br /> Page two <br /> 'fhe SGPA revicw will address project consistency widi thc C:ty's critical area regula[ions, as <br /> well as potential impacts related to noise, dust, water quality and any other issues of concern <br /> identiticd during the review. I'icase note that, following completion of the SEPA review, BNSP <br /> must obtain a Public Works permit from tl�e City to address construction details consistent with <br /> the City of Gverett Design and Construction manual and any conditions established during the <br /> environinental review pmcess. <br /> We �vould be happy to arrange a pre-�pplication meeting with City departments to identify any <br /> City concerns at this stage ofyour project developmert. A Pre•Application form is attached for <br /> your convenicnce. <br /> If you have any questions, please do not hcsitate to cail cither me or Gerry Grvinc, Land Use <br /> Manager, at (425) 257-5731. <br /> Sinccrcly, <br /> ��CZC <br /> Allnn Gif�en <br /> Director <br /> Cc: Kirk Brooks, Enginccring Scrviccs; <br /> Jim Green, Dept. of tl�e Army, Scatde District, Corps ol'�ngineers, P.O. [3ox 3755, <br /> ScatUc, WA 98124-3755 <br /> �J <br />