Laserfiche WebLink
� <br /> forwarded to you for your signature. Prior to commencement of GTE's engineering for <br /> such rearrangement, a deposit will be required. To insure timely telephone service, <br /> GTE requests ninety (90) days lead time for engineering, procurement, and installation <br /> of cable and/or GTE's equipment. <br /> Please contact Michael Hupf, Senior Engineer, at 356-4052 should you require <br /> additional information. <br />