My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11000 16TH AVE SE 2016-01-01 MF Import
>
Address Records
>
16TH AVE SE
>
11000
>
11000 16TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2017 9:11:02 AM
Creation date
4/4/2017 1:33:01 PM
Metadata
Fields
Template:
Address Document
Street Name
16TH AVE SE
Street Number
11000
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--, <br /> . ; <br /> � � � <br /> m � x <br /> � y � <br /> H � � <br /> rC C) <br /> H 7tl <br /> "�s1 H 'TJ <br /> G� H <br /> H <br /> � 0� <br /> OH � I <br /> C] <br /> �� � g. About what percent of the site will be covered with impervious <br /> z y� surfaces after project construction (for example, asphalt or ', <br /> � x buildings)? <br /> h-� y <br /> g �� Coverage with imaervious surfaces is not expected to exceed 46 <br /> � percent. ' <br /> r <br /> y o y h. Proposed measures to reduce or control erosion, or other impacts � <br /> to the earth, if any: � <br /> Naturally-occurring evergreen vegetat�on will be retained I <br /> wherever practicable on the western, northern and southern <br /> margins of the site, augmented with selected planti�igs of shrubs <br /> and trees. With the anticipated planting of cleared areas with <br /> lawns and shrubs and the gently slopin9 nature of the site, <br /> post-constt�uction potential for erosion is expected to be low . <br /> or not greater than pre-construction levels. During preparation <br /> of driveways and building pads and installation of utility <br /> systems, temporary draina9e and erosion control devices such as <br /> silt fences, temporary holding/siltation ponds anu straw bales i <br /> will be installed where necessary to the temporary erosion and i <br /> sedimentation control plan and monitored to pro��ide protection. <br /> .' � I <br /> � ��� Following grading, any and all drainage will be conveyed to the ? <br /> ''� , drainage system for treatment with oil/grease separation and <br /> � biofiltration within grass-iined swales. I <br /> I �=�'g , 2. AIR � <br /> ..r ' <br /> a. What types of emissions to the air would result from Lhe <br /> � proposal (i .e. , dust, automobile, odors, industrial wood smoke) ' <br /> I �"� ' ' during construction and when the project is completed? If any, <br /> ��� generally describe and give approximate quantities if known. <br /> , ; During construction, emissions will include those typically <br /> � f resulting from the use of automotive and construction equipment. <br /> � "���� Odors from construction materials will be present during <br /> construction and dust and smoke may be generated during short <br /> " term clearing and grading activities. Upon project completion <br /> I and habitation, increased motor vehicle use on the site will <br /> ��...I produce automotive emissions. Use of zero-clearance fireplaces <br /> � � in 136 of the 220 units will produce emissions. i <br /> � e. b. Are there any off-site sources of emissions or odor that may <br /> .Osl „� affect your proposal? If so, 9enerally describe. ' <br /> � Vehicular traffic utilizing Interstate 5 and neighboring streets i <br /> produce the only known offsite source of emissions or odor. <br /> I <br /> I <br /> 6 ; <br /> . � <br /> � � � <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.