Laserfiche WebLink
� � � ' <br /> � � x <br /> C9 H <br /> ryy <br /> H �� <br /> �C c) <br /> H � <br /> � H �) <br /> fA H <br /> y a <br /> � OE*7 <br /> H t7 <br /> OH <br /> H � g <br /> �� n a i <br /> z H 6) Does the proposal involve any discharges of waste materials to <br /> � y� surface waters? If so, describe the Lype of waste and anticipated <br /> H y , volume nf discharge. <br /> �y <br /> d� Storm water and runoff from impervious s��rfaces will be <br /> �� � collected into an enclosed storm dra9��aye system for <br /> z y �, transmission to oil and grease separators prior to conduction <br /> y o v� to the stormwater facilities detailed in the Storm Drainage <br /> Plan. A portion of the stormwater will �ltimately flow to the <br /> � proposed city water quality restoration wet pond in the Pnase <br /> 2 project location. The remainder of '.'.ie f'ows will move <br /> southward and the majority of these �dill be conducted to a <br /> ; detention/grass-lined swale areas in the south for ultimate <br /> discharge to the existing stormwater system within 16th Avenue <br /> S.E. <br /> b. Ground: <br /> 1) Will ground water be withdrawn, or will water be discharged to <br /> ground water? Give general descripti�n, purpose, and approximate <br /> quantities if known. <br /> I Si��` No Hater will be discharyed directly to 9roundwater. <br /> � 2.) Describe waste material that will be discharged into the ground <br /> from sepiic tanks or other sour�ces, if any (ior example: Domestic <br /> I �'�'� sewage; industrial , containin9 the following chemicals . . . ; <br /> �� , , agricultural ; etc.) . Describe the general size of the system, the <br /> number of such systems, the number of ho.�ses to be served (if <br /> applicable), or the number of animals or hu�nans the system(s) are <br /> `�� expected to serve. <br /> I1 „ <br /> r� In cencert with concerned agencies, a pi�oyram of contractor <br /> education and spill contingency and rz:Per�se plan compliance <br /> will be instituted to reduce the pot��n�ial for discharge of <br /> i �1 1 waste materials to the ground during construction activities. <br /> The instant project will construct an internal nublic sanitary <br /> ` sewer collection system to serve the deveiopmc+nt, serviced by <br /> ' ���) the City of Everett. No domestic waste material will be <br /> i discharged into the ground on the site. <br /> , <br /> (�.' � c. Water Runoff (including storm water): <br /> � � , 1) Describe the source of runoff (includin9 storm ��ater) and <br /> method of collection and disposal , if any (include caan'.ities, if <br /> known) . Where will this water flow? Will this water• flow into <br /> other waters? If so, describe. <br /> In addition to inputs from the north and Interstate 5 to the <br /> west, the principal source of runoff o-�i'1 be rainwater and snow <br /> melt from impervious surfaces such as roofs, driveways (and <br /> 9 <br />