Laserfiche WebLink
�� � <br /> m � x <br /> Cy �-+ <br /> t' 'y.y['. � <br /> Hx � <br /> �C C) <br /> y7tl <br /> �H � <br /> f/7 H <br /> t+7 O � <br /> Hl7 <br /> OH i <br /> � �g <br /> H` � 2) Will the project require any work over, in, or adjacent to <br /> �N � (within 200 feet) the described waters? If yes, please descr�be <br /> H y and attach available plans. <br /> gti <br /> d y Yes. Similar to the uplands areas, the delineated wetlands will <br /> �� , be excavated to remove brush and surficial or9anic material . <br /> � The excavated material will be replaced with competent fill . <br /> y o y As discussed in the Wetland De'ineation report, impacts to the <br /> stormwater storage and biological values of this area will be <br /> mitigated within the proposed City of Everett wet pond water <br /> quality facility to be located in the Phase 2 site a� part of <br /> the regional water quality restoration plans. <br /> 3) Estimate the amount of fill and dredge material that would be <br /> placed in or removed from surface water or wetlands and indicate <br /> the area of the site that would be affected. Indicate the source <br /> of fill material . <br /> Approximately 600 to 1000 cubic yards of material are antici- <br /> pated to be removed from the wetlands area and approximately <br /> 1200 to 2000 cubic yards of fill are anticipated to be required <br /> to brin9 the area up to finished grade. The source of the fill <br /> ��-s� will be from excavation for buiiding pads on the site. <br /> 4) Will the proposal require surface water withdr•awals or <br /> diversions? Cive general description, purpose, and approximate <br /> 1 ��.o' quantities if known. <br /> _...a <br /> As indicated in the previously submitted Storm Drainage Plan, <br /> surface water enterin9 the site from the north will be <br /> (...,� � , intercepted in a 12 inch concrete pipe to the site stormwater <br /> j � E system, for discharge into the existing stormwater system within <br /> ! � 16th Avenue S.E. and ultimate discharge into the proposed city <br /> water quality restoration pond in the Phase 2 site. In a like <br /> manner, stormwater flowin9 eastarly onto the site from <br /> I � ( Interstate 5 will be intercepted and combined with site <br /> �" stormwaters for transmission to the grass-lined bio- <br /> filtration/recharge swale alon9 the southern site boundary. <br /> Water not subject to recharge within the swale will be <br /> I � � intercepted at the downstream end of the swale and conducted to <br /> � the existing stormwater facilities in 16th Avenue S.E. , for <br /> �� treatment in the existing oil\water separation facilities and <br /> ultimate fiow to Silver Lake. No other withdrawals or <br /> �d. <br /> diversions of surface water are proposed or ar�ticip .ed. <br /> � . <br /> 5) Does the proposal lie within a 100-year floodplain? If so, <br /> note location on the site plan. <br /> Na. <br /> 8 <br /> , <br /> -��.so <br />