My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11009 16TH AVE SE 2016-01-01 MF Import
>
Address Records
>
16TH AVE SE
>
11009
>
11009 16TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 1:42:28 PM
Creation date
4/4/2017 1:42:07 PM
Metadata
Fields
Template:
Address Document
Street Name
16TH AVE SE
Street Number
11009
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of additional impac' mitigation). Prior to finalization of the SEPA determination, thF: <br /> a;:;�licant must sut t a site plan showing adequate recreation facilities on the site. <br /> As part of the builc�ng permit application, the Applicant must submit a recreation plan <br /> inciuding standards and specifications for recreation areas and equipment, both inside <br /> and outside the building, including pictures of proposed equipment. if sufficient <br /> information is not knovm at time of submittal for buiiding permits, minimum specifications <br /> or examples must be provided. Prior to the issuance of Building Pertnits, the Pianning <br /> Department must approve a plan for the on-site recreation facilities. Tot lots must be <br /> located in <:entral areas, where adequate supervision of children can be provided. <br /> 35. Building facade modul�tion and roi�fline variation must be provided per Section 15.050 of <br /> th: Zoning Code. The maximurn p�rmitted wall length without building facade <br /> m�dulation is 30 feet. <br /> 36. The Washington State Clean Air Act requires the use of all known, available, and <br /> reasonable means of controlling air pollution, inclvding dust. Dust generated during <br /> constliction activities can be controlled by wetting those dust sources such as areas of <br /> exposed soils, washing truck wh2els before they leave the site, and installing and <br /> maintaining clravel construction zntrances. Construction vehicle track-out is also a major <br /> dust source. Any evidence of track-out can trigger violations and fines from the <br /> Department of Ecology or the Puget Sound Air Pollution Cuntrol Agency. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.