My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9624 18TH AVE W 2016-01-01 MF Import
>
Address Records
>
18TH AVE W
>
9624
>
9624 18TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 5:18:49 PM
Creation date
4/4/2017 3:36:30 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9624
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. T'�e existing family home daycare facility provides services for 12 <br />children. It is the intent of the Applicant to convert the facility to a full <br />time facility that will provide care for up to 40 children. Tlie increase in <br />the daycare population will be generated from new residences that are <br />being developed in the area; approximately 50-75 new single-family <br />homes are being constructed. The proposal serves a neighborhood, <br />district, and city need. (Meacham testimony, Palacios testimony) <br />7. The site fronts 18th Avenue West, which is under reconstruction because <br />of the residential develcpment in the area. Included in '; development <br />are streei improvements and sewer main. When these improvements <br />are completed, adequate utilities and access to the site will be available <br />without any further disruption. (Palacios testimony) <br />The City of Everett Public VVorks Department revievied the proposed <br />project and determined that additional half-street frontage improvements <br />are required for 18th Avenue West. These include curbs, gutters, <br />sidewalks, and drainage. The Applicant will also be required to conr,ect <br />to tFie new sewer line. (Exhibit 1, Mckee testimony) The Applicant <br />submitted that while these improvements will be quite costly, the half- <br />street improvements can be completed. (Meacham testimony) <br />9. The existing gravel driveway on-site will be paved. At the end oF the <br />driveway will be an area for parking for parentslguardians and staff. <br />(Meacham testimony) <br />10. As part of the development, the City determined that there is a need for <br />an on-site access and loading/drop-off area. This type of road design <br />will eliminate backup of traffic on 18th A�ienue West. (Palacios <br />testimony) <br />11. If the subject property were to be developed to R-3L zoning standards, a <br />multiple-family structure could be developed on-site with an allowed <br />density of 36 units. The traffic generated by such a development �vould <br />be significantly greater than the traffic generated by the proposed facility. <br />(exhibit 1, Palacios testimony) <br />12. While Rhe proposed use will have less impact than a multi-family <br />development, it will result in some impacts to traffic and pedestrian flow. <br />Because of these impacts, improvements to the streets in the area will <br />be required. The City's Traffic Engineer reviewed the prop�sa! and <br />determined that a payment of approximately $18,000 was necessary to <br />mitigate the impacts. The final mitigation amount will he calculated at the <br />�v <br />
The URL can be used to link to this page
Your browser does not support the video tag.