My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/02/18 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/02/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:35:26 AM
Creation date
4/5/2017 9:35:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/18/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> EXHIBIT A <br /> CITY OF EVERETT <br /> DESIGN OF A NEW CLEARWELL AT THE <br /> CHAPLAIN RESERVOIR WATER FILTRATION PLANT <br /> AMENDMENT NO. 2 <br /> SCOPE OF SERVICES <br /> The original scope of services for the project was to prepare a preliminary design, final design, <br /> and Contract Documents for the construction of a new clearwell for the Chaplain Reservoir <br /> Water Filtration Plant (WFP). Amendment No. 1 included additional design phase services and <br /> engineering services during construction. Amendment No. 2 includes the scope of services and <br /> fee estimate for additional work required during the construction phase, as well as for out-of- <br /> scope work completed at the request of the City. This Exhibit A contains the scope of services, <br /> while Exhibit B contains the accompanying fee estimate. <br /> ENGINEERING SERVICES DURING CONSTRUCTION <br /> The scope of services authorized under Amendment One is included below for reference, as <br /> well as the scopeof services for this Amendment No. 2. <br /> TASK 7 - Construction Support and Inspection <br /> 7.1 Project Management <br /> Existing Scope: Provide project management services throughout the duration of the project, <br /> including overall team and discipline coordination, track time and budget expended, provide <br /> monthly summaries, and prepare monthly progress reports to be submitted with invoices. <br /> Amendment No. 2 Scope: None Required. <br /> 7.2 Review Shop Drawings, Clarifications and Requests for Information <br /> Existing Scope: Interpret the drawings and specifications, including the preparation of <br /> elementary sketches, to clarify design as may be required by the Contractor(s). Prepare written <br /> responses to all Requests for Information (RFls). <br /> Review shop drawings and working drawings of fabricated and manufactured equipment <br /> submitted by the Contractor. City staff will log shop drawings and send to the Engineer to review <br /> 0 <br /> H:\Client\Everett_SEA1Contracts\7094A10-Clearwell dsgn\Amend 2\Exhibit A A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.