n <br /> v,. <br /> for conformance with the Contract Documents. The Engineer shall track shop drawings to <br /> ensure that appropriate turnaround times are met. <br /> Amendment No. 2 Scope: A significant level of unanticipated review and additional Carollo staff <br /> time was required to address several Contractor submittals. For example, Submittal No. 3, <br /> Construction Schedule, ultimately required Carollo to retain the services of a specialty <br /> subconsultant, Construction Management Services, for the review of the Contractor's <br /> construction schedule. Submittal No. 16, Concrete Mix Design, required repeated submittal <br /> review and discussions with both the Contractor and concrete supplier in order to determine the <br /> acceptability of the concrete mix design. <br /> 7.3 Evaluate Change Orders <br /> Existing Scope: Evaluate a maximum of two change order requests, and if processed, ensure <br /> that the integrity of the original design intent has not been changed. <br /> Amendment No. 2 Scope: Carollo evaluated many change order requests for the project as part <br /> of the Amendment No. 1 services, but a significant level of effort was required for yard piping <br /> modifications. This included a significant level of both engineering analysis and CAD time for <br /> revising and re-issuing Contract Drawings for the affected areas. <br /> 7.4 On-Site Inspection Services <br /> Existing Scope: The City will provide day-to-day, on-site inspection services for the project. The <br /> Engineer will supplement City staff by providing periodic site visits from the Project Engineer <br /> and Discipline Engineers. <br /> Project Manager-Visit the project site on an average of 1.5 days/month for the duration of the <br /> project. <br /> Project Engineer-Visit the project site on an average of 3 days/month for the duration of the <br /> project. It is assumed that time at the site will be spent at construction meetings; providing site <br /> review; working with City-maintained Document Control Log; and meeting with City staff. <br /> Discipline Engineer-When needed, the Engineer will provide on-site discipline engineers at the <br /> City's request. For purposes of this scope of work, it is assumed that a maximum of 3 visits from <br /> each of the following will be provided: Structural Engineer, Mechanical Engineer, and Electrical <br /> or Controls Engineer. If possible, these visits will coincide with the biweekly Construction <br /> meeting. <br /> The Engineer will also provide geotechnical representation during the geotechnical site <br /> improvements, which include stone column installation and jet grouting. Based on an estimated <br /> four-month window of full-time geotechnical work, the following assumptions are included for <br /> work undertaken by the geotechnical subconsultant: <br /> H:1Client\Everett_SEAContracts17094A10-Clearwell dsgn\Amend 2Exhibit A p A-2 <br />