My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/02/18 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/02/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:35:26 AM
Creation date
4/5/2017 9:35:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/18/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iv <br /> 8.3 Final Inspection and Completion (16 hours) <br /> Existing Scope: In conjunction with City staff, perform the final inspection. Provide written <br /> certification of completion and conformance of the project to the Contract Documents. <br /> Amendment No. 2 Scope: None Required. <br /> 8.4 Prepare Construction Record Drawings (230 hours) <br /> Existing Scope: Prepare conformed as-built record drawings based on red-lined shop and <br /> contract drawings maintained by the Contractor for this project. Provide the City with an <br /> electronic and hard copy of the record drawings in an acceptable format. <br /> Amendment No. 2 Scope: None Required. <br /> 8.5 O&M Manual (64 hours) <br /> Existing Scope: Develop an Operations and Maintenance (O&M) manual for the primary <br /> mechanical equipment, SCADA, telemetry and TRU systems individually and as an integrated <br /> whole. The O&M manual will provide descriptions and specifications of all hardware, software, <br /> programming, configuration, and operation of the system. The O&M manual will be used as a <br /> training document as well as for system custodianship. <br /> Amendment No. 2 Scope: None Required. <br /> 8.6 Training (20 hours) <br /> Existing Scope: Provide training on all manual, automatic, programmed, communications, and <br /> software operational aspects of the system. Utilize the O&M manual as a training document. <br /> Amendment No. 2 Scope: None Required. <br /> TASK 9 — Unanticipated Construction Period Services <br /> 9.1 Unanticipated Construction Period Services <br /> Existing Scope: None. <br /> Amendment No. 2 Scope: There have been several requests during the construction period to <br /> assist the City in addressing issues that have arisen during the construction period that were not <br /> anticipated when the original scope of services were developed.These are described below: <br /> • Alternate Clearwell.Design. At the outset of the project, the Contractor claimed that the <br /> existing clearwell design could not be constructed within the 24-month contractual limit, and <br /> H.Client\Everett_SEA1Contracts\7094A10-Clearwell dsgnWmend 21Exhibit A <br /> 3 I. A-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.