My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/03/25 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/03/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 11:28:03 AM
Creation date
4/5/2017 11:26:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/25/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The portion of the south Simpson site that the City sold to the Washington State Department of <br /> Transportation for I-5 stormwater facilities will be rezoned to Open Space. <br /> The area encompassed by the Project has five distinct geographic areas(See Figure 2): <br /> 1)Tire Fire/Landfill Site: This area is bordered on the north by 36th Street; on the west by the <br /> BNSF mainline/right-of-way; and on the east and south by the diagonal created by the former <br /> Milwaukee Road railroad right-of-way. <br /> 2) Simpson Pad: This area is generally south and west of the area described below as the <br /> Simpson Category 1 Wetlands and Riparian Corridor; and north of the area described below as <br /> the South Simpson Site. This area is identified in the Everett General Plan and related <br /> documents as the"Developable Portion of Simpson Site". <br /> 3) Simpson Category 1 Wetlands and Riparian Corridor: This lies between the Tire Fire/ <br /> Landfill site,the BNSF Mainline on the east,and between the Snohomish River and the upland <br /> area known as the Simpson Pad or the Developable Portion of Simpson Site. This area is <br /> comprised entirely of areas that are or will be aquatic or riparian habitat and public access. <br /> 4) South Simpson Site: This area lies between the BNSF mainline on the west, the Snohomish <br /> River on the east,the WSDOT water treatment property on the south and the Simpson Pad on the <br /> north. This area is comprised entirely of areas that are or will be aquatic or riparian habitat and <br /> public access. <br /> 5)Eclipse Mill Site: This area lies north of the easterly extension of 36th Street,east of the <br /> BNSF `C'-line track and right-of-way, west of the Snohomish River and south of Pacific <br /> Avenue. <br /> Project Detail: The proposed conceptual master plan includes the construction of a mix of <br /> commercial space, hotel space, and single-family and multi-family residential units. The range <br /> of uses to be analyzed in the EIS will be a combination of commercial uses up to 1,200,000 <br /> square feet;up to 1,500 residential units; and up to 150,000 square feet of hotel use. The project <br /> is intended to provide a balance of the uses such that the maximum development limits cannot be <br /> met simultaneously; as the intensity of one use increases the others generally decrease. (For <br /> example, as the amount of retail/office use increases,the total number of residential units <br /> decreases.) The types of uses in the description of"commercial" include, for example, retail, <br /> restaurant,theater, office and professional uses. <br /> Public amenities included in the proposal are wetland enhancements,trail extensions,multi-use <br /> public spaces for indoor and outdoor gathering, and possibly a multi-purpose boat dock. <br /> Residential uses are a mix of single-family and multi-family residential units. <br /> The project is proposed to attain, at a minimum, a certification level of Silver from the U.S. <br /> Green Building Council's LEED (Leadership in Energy and Environmental Design) Green <br /> Building Rating System. The Council's Core Purpose is to transform the way buildings and <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.