My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/04/08 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/04/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 11:41:55 AM
Creation date
4/5/2017 11:41:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..J <br /> • Provide trained operational personnel for planned on the water drills at regional <br /> facilities. <br /> • Provide operational personnel to support the Full Scale Exercise(SEP 2009) <br /> through the planning to evaluation phases. <br /> • Provide operational assessments of rad/nuc detection equipment on Agency vessel <br /> for the Pilot Project. <br /> Program Management <br /> The contractor will report directly to Bill Peterson. The contractor will maintain cost and <br /> schedule currency. <br /> VII. Schedule <br /> Milestones and Deliverables <br /> • Provide the names of Agency personnel and a cost sheet for the travel, overtime <br /> and backfill for those personnel that received Pilot training, supported drills and <br /> Exercise functions. <br /> • Provide the cost sheets associated with any agreed upon Pilot operational <br /> assessments with Agency vessel and personnel. <br /> VII. Environmental, Safety, and Health Requirements <br /> No particular requirements. <br /> 2 Z0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.