My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/04/01 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/04/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 8:40:05 AM
Creation date
4/7/2017 8:39:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/1/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—� EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Amendment No. 1 to Consent COUNCIL BILL# <br /> Professional Services X .Action Originating Department PW/Utilities <br /> Agreement with Murray, Smith First Reading Contact Person David Voigt <br /> & Associates, Inc. to extend Second Reading Phone Number 425-257-8983 <br /> the contract term to July 31, Third Reading FOR AGENDA OF April 1,2009 <br /> 2009 for preliminary Public Hearing <br /> • <br /> engineering services for the Initialed by: <br /> Sewer Lift Station No. 24 Department Heal • <br /> �. ''\\ <br /> Replacement Project, with no CAA / CAO <br /> additional costs. Council President 0 I,_ <br /> Location Preceding Action Attachments Department(s) Approval <br /> South Everett (not in PSA, August 29, 2007 Amendment No. 1 <br /> City limits) <br /> Amount Budgeted $240,000 <br /> Expenditure Required $0 Account Number(s): UP 3313 • <br /> Budget Remaining $37,884 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> This amendment is to extend the term of the Professional Services Agreement through July 31, 2009 in order <br /> to finish the preliminary design tasks. There is no cost adjustment associated with this amendment. <br /> This project is identified in the City of Everett Final 2006 Comprehensive Sewer Plan as Capital Project <br /> SE7-15. The existing sewer lift station facilities will be removed and replaced with new structures and <br /> equipment. This sewer lift station is located at 12,000 Silver Way (west of I-5 near 120th St SE). <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with Murray, Smith <br /> & Associates, Inc. to extend the contract term to July 31, 2009 for preliminary engineering services for Sewer <br /> Litt Station No. 24 Replacement project with no additional costs. <br /> S:•DVoigt'Lilt Sta 24_MSA_UP3313'Council and Bdgt Coni'LS#24 Rplemt_MSA Amend No I_Cod Agenda Cover.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.