My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/04/01 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/04/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 8:40:05 AM
Creation date
4/7/2017 8:39:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/1/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 �"r r Mfr$ � E �s E U F F7 J fe. r 7�FF jf�ppl r ��t ` `r [' x E r`Vt,�E`�5,�''4^e E a „e` ��°.a"CRRR''^ t, b@�€. �.} E`1`[�x , ,;•'d t r 'i <br /> PROJECT TITLE: 1 <br /> Consent COUNCIL BILL# <br /> Maintenance and Right of Entry X Action Originating Department Engineering <br /> Agreement, GM 1497, with the First Reading Contact Person Dave Davis, PE <br /> State of Washington Department of Second Reading Phone Number 425-257-8913 <br /> Transportation(WSDOT) For Third Reading FOR AGENDA OF April 1, 2008 <br /> Drainage Structures, Drainage/ Public Hearing <br /> Pedestrian Bridge and Trails, and Initialed by: <br /> Water Quality Site. Department Head <br /> CAA <br /> Council President ---4;CS& <br /> Location Preceding Action Attachments Department(s) Approval <br /> Vicinity of I-5 and 41St 3/4/05 Agreement GM Maintenance and Right Legal, Utilities, Parks <br /> Street, and Riverfront 1422 executed. of Entry Agreement, GM <br /> development area. 1497 <br /> Amount Budgeted N/A <br /> Expenditure Required N/A Account Number(s): <br /> Budget Remaining N/A <br /> Additional Required N/A <br /> DETAILED SUMMARY STATEMENT: <br /> As part of the I-5 HOV Project,the Washington State Department of Transportation(WSDOT) entered into <br /> agreement GM 1422, on March 4, 2005,with the City to construct drainage, water quality, and pedestrian <br /> improvements in the vicinity of the Project. <br /> With the completion of the I-5 HOV Project,the City and WSDOT now need to enter into a new agreement <br /> to clarify their maintenance, operation, and safety obligations for the drainage structures, drainage/pedestrian <br /> bridge and trails. This Agreement also terminates agreement GM 1422, as amended. <br /> City staff has participated with WSDOT in the development of this agreement. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the Maintenance and Right of Entry Agreement, GM 1497, with the State of <br /> Washington Department of Transportation (WSDOT) for Drainage Structures, Drainage/Pedestrian Bridge <br /> and Trails,and Water Quality Site. <br /> xi 0 <br /> GM 1497 WSDOT 3-09.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.