Laserfiche WebLink
4 n MAINTENANCE AND RIGHT OF ENTRY AGREEMENT <br /> 1 'Li GM 1497 <br /> For <br /> Drainage Structures, Drainage/Pedestrian Bridge and Trails, and Water Quality Site <br /> THIS AGREEMENT is made and entered into between the State of Washington Department of <br /> Transportation,hereinafter the"STATE,"and the City of Everett,a Washington municipal corporation, <br /> hereinafter the"CITY"; collectively,hereinafter referred to as the"PARTIES,"or individually, the <br /> "PARTY." <br /> WHEREAS,the STATE constructed a highway project, entitled I-5 Everett, SR 526 to US 2, HOV <br /> Lanes, which added to I-5 a northbound and southbound HOV lane,and replaced the 415` St. Interchange, <br /> hereinafter the"PROJECT"; and <br /> WHEREAS,the PROJECT required the construction of certain state-owned drainage features to be <br /> located within city-owned right of way on Lowell Road, 3`d Avenue, and Main Street,between I-5 and <br /> Water Quality Site One pursuant to a right of entry under Agreement GM 1422, dated March 4, 2005, and <br /> GM 1422 Supplement 1,dated August 31, 2005; and <br /> WHEREAS,the PROJECT also required the construction of Water Quality Site One("WQ1") on state- <br /> owned land, as well as an Outfall for the drainage system located on an easement obtained by the STATE <br /> from the CITY(Easement for Everett Outfall); and <br /> WHEREAS,the PROJECT also required the construction of a Drainage/Pedestrian Bridge, located on <br /> state-owned land and partially on easements obtained by the STATE from the CITY, Burlington Northern <br /> and Santa Fe Railroad, and property owners Hammer, et al; and <br /> WHEREAS,the STATE has constructed, at the request of the CITY,the pedestrian portion of the <br /> Drainage/Pedestrian Bridge, as well as Trails through WQ1, so as to provide a connection to a CITY trail <br /> system; and <br /> WHEREAS,the STATE and CITY wish to terminate GM 1422 and Supplement 1 and clarify each <br /> PARTY's maintenance, operation, and safety obligations for the drainage structures,Drainage/Pedestrian <br /> Bridge and Trails, <br /> NOW,THEREFORE,pursuant to RCW 47.28.140 and chapter 39.34 RCW, and in consideration of the <br /> terms, conditions,covenants, and performances contained herein, <br /> IT IS MUTUALLY AGREED AS FOLLOWS: <br /> 1. TERMINATION OF PRIOR AGREEMENTS <br /> 1.1 Cooperative Agreement GM 1422, dated March 4, 2005, and GM 1422 Supplement 1, dated <br /> August 31, 2005, shall be terminated on the effective date of this Agreement(section 6.1). <br /> 2. RIGHT OF ENTRY <br /> 2.1 The CITY grants to the STATE, its employees, agents, contractors, the right of ingress and <br /> egress across the CITY rights of way comprising Lowell Road, 3`d Avenue, and Main Street for the <br /> 1 <br />