Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: Consent COUNCIL BILL# 8 <br /> Amendment No. 1 to the X Action Originating Department Public Works <br /> Professional Services First Reading Contact Person Mark Sadler <br /> Agreement with Aspect Second Reading Phone Number 257-8967 <br /> Consulting for Geotechnical Third Reading FOR AGENDA OF April 15, 2009 <br /> Engineering Study Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA �1 <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Riverfront Property 8/27/08 Budget Comm. Amendment No. 1 <br /> 9/3/08 Council Approved <br /> Original PSA <br /> Amount Budgeted $55,000. <br /> Expenditure Required $0 Account Number(s): UT-3359-4-3 <br /> Budget Remaining $52,700. <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Aspect Consulting is conducting a geotechnical evaluation of the 65-acre Riverside Property. Aspect <br /> Consulting is reviewing relevant, readily available geotechnical data to gain a preliminary understanding of <br /> the subsurface conditions of the land, complete initial subsurface explorations to the site to obtain knowledge <br /> of the specific subsurface conditions at the property, and to provide a geotechnical analysis report. <br /> Additional time is required to complete the study. <br /> This is a time extension to December 31, 2009, only with no additional costs. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with Aspect <br /> Consulting for Geotechnical Engineering Study to extend the completion date to December 31, 2009,with no <br /> additional costs. <br /> ,4. <br /> S:#cor m onclerical\Mark S\Amend Nol-Aspect-Agn 4-15-09(PC 4-2-09) <br />