My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/04/29 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/04/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 9:09:21 AM
Creation date
4/7/2017 9:08:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 Project: WFP Clearwell No. 2 <br /> Change Order No.4 <br /> Effective April 06, 2009 <br /> Exhibit A - Description of Changed Work <br /> Change Order#4 <br /> Create New"Bid Item #7 —entitled, "Change Order#4", in the lump sum amount of$55,294.13, <br /> which shall incorporate Work Change Directives 043, 046, 051, 052, 055, 056, 057, 058 and 059 per <br /> the following: <br /> 1. Work Change Directive 043 —Clearwell Flow Distribution Structure construction of an overflow <br /> diversion structure and revised location of the stair. Increase Contract amount by $16,293.19. <br /> 2. Work Change Directive 046—Backwash and surface wash pump revisions. Increase Contract <br /> amount by $4,001.73. Make the following revisions to the backwash pumps and the surface wash <br /> pump: <br /> A. Add 120 volt circuits to the backwash and surface wash motors, for the space heaters in <br /> the motors. <br /> B. Reroute the wiring for the limit switch on the Golden Anderson recirculation valve from <br /> the existing MCC, in the Clearwell Control Structure, to LCP-BWPS in the new Electrical <br /> Room of the Backwash Pump Station. <br /> C. Reroute the wiring for the two solenoid valves and relocate a relay, associated with the <br /> Golden Anderson recirculation valve, from the existing MCC in the Clearwell Control <br /> Structure to LCP-BWPS in the new Electrical Room of the Backwash Pump Station. <br /> D. Provide a new 120 volt circuit for the existing level transmitter, LIT-50, from the new <br /> 120/240 panel LC, located the new Electrical Room of the Backwash Pump Station. <br /> E. Provide new wiring and switches necessary to install a light switch adjacent to door 501 <br /> in the Pump Room of the Backwash Pump Station. <br /> F. Provide piping for the Golden-Anderson control valve replacing existing supply piping <br /> and providing drain piping. <br /> 3. Work Change Directive 051 —Provide an oil separator for the tapping tee and Clearwell Flow <br /> Distribution Structure excavation dewatering water. Increase Contract amount by $11,401.28. <br /> 4. Work Change Directive 052 - Provide temporary power for slide gate CCS-SG-4 located south of <br /> the Backwash Pump Station to assist the City of Everett staff during Plant shut down. Increase <br /> Contract amount by $ 830.80. <br /> 5. Work Change Directive 055 — Install a 4-inch isolation gate valve on the water line to Clearwell <br /> No. 2. Increase the Contract amount by$2,355.14. <br /> 6. Work Change Directive 056—Add power monitoring devices and suction and discharge gauges to <br /> each of the four sample pumps. Increase the Contract by $12,461.91. <br /> 7. Work Change Directive 057—Raise an existing chemical vault to the proposed new site grade. <br /> Increase the Contract by $3,637.16. <br /> 51 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.