My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/05/20 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/05/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 9:37:31 AM
Creation date
4/7/2017 9:37:17 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/20/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> and indirect costs and impacts.The contract price shall be adjusted as <br /> described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below <br /> which the Mayor or his designee is authorized to direct Contractor to <br /> perform additional work. in calculating such threshold amounts, <br /> Washington State sales tax,if applicable to the Work, has been considered. <br /> 4. The duration of the Contract.shall be adjusted to the extent described in <br /> this Change.Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related <br /> to,this Change Order, the work described in Exhibit A,and all work and <br /> actual or constructive changes that occurred or began.prior to the date of <br /> this Change Order,including,but not limited to,claims for equitable <br /> adjustment of time and compensation.,delay,impact, overhead,or <br /> inefficiencies. This Change Order relates to a disputed claim which is <br /> being settled in order to close out the contract. Accordingly,this Change <br /> Order constitutes full and final settlement of all work involved under the <br /> contract between the parties for Puget Sound Outfall 5 Overflow Structure <br /> and release and settlement of any and all claims by the contractor against <br /> the City or Everett,including but not limited to any and.all claims or <br /> disputes arising through or from laborers,materialmen,equipment <br /> suppliers, or subcontractors. <br /> 6. This Change Order only changes the contract between Contractor and City <br /> to the extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> • <br /> • <br /> • <br /> • <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Project Engineer (if Engin ering Department Director <br /> Manager(if applicable) maga(if • <br /> applicable) a,.licable) <br /> de . 1.Date: • ••. Date: ate:_1,11r .._ Date: __574,09!___ <br /> . <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.