Laserfiche WebLink
9 , <br /> 4 <br /> STELLAR J CORPORATION <br /> City of Everett Clearwell No.2 <br /> City of Everett W.O.#UP 3198-2 <br /> SJC Project No:579 <br /> Change,Order Proposal No WCD 020 REVISED <br /> Description: Delete floor in flow meter vault <br /> Contract Time Extension Request: None <br /> Date: REVISED May 12,2009 <br /> Change Order Proposal Summary: <br /> DESCRIPTION Rates COST <br /> Labor Cost Daily Total: — $75.00 <br /> Lump Sum Mark-up: 20% $15.00 <br /> SJC Direct Cost Daily Total: -- $0.00 <br /> Lump Sum Mark-up: 5% $0.00 <br /> All Other Direct Cost Daily Total: — ($1,380.00) <br /> SIT: — ($1,290.00) <br /> WSST 8.6%: 8.60% ($110.94) <br /> TOTAL LUMP SUM PRICE(Including Tax): — ($1,400.94) <br /> • SIT Labor Hours: 1.00 <br /> • <br /> . Notes: <br /> 1. This proposal is based on straight time labor and equipment unless expressly noted. <br /> 2. This proposal is for direct costs only,Contractor reserves the right to claim for impact andconsequential costs. <br /> Page 1 <br /> 17 <br />