Laserfiche WebLink
STELLAR J CORPORATION <br /> City of Everett Clearwell No.2 <br /> City of Everett W.O.#UP 3198-2 <br /> SJC Project No:579 <br /> Change Order Proposal No: WCD-020 REVISED <br /> Description: Deteteflootiti'flow meter vault <br /> Contract Time Extension Request: None <br /> Date: REVISED May 12,2009 <br /> Change Order Proposal Direct Cost Detail: <br /> LABOR: <br /> NO. DESCRIPTION UNIT UNITS UNIT COST TOTAL COST <br /> 1 Price Preparation and Procurement HR . 1.00 $75.00 $75.00 <br /> 2 HR - $0.00 $0.00 <br /> 3 HR - $0.00 $0.00 <br /> 4 HR - $0.00 $0.00 <br /> 5 HR - $0.00 $0.00 <br /> 6 HR $0.00 <br /> 7 HR $0.00 <br /> 8 HR $0.00 <br /> 9 HR $0.00 <br /> 10 Per Diem HR - $6.00 $0.00 <br /> 11 Lodging HR $0.00 <br /> Tot. Hrs. 1.00 --- -- <br /> Total Labor Cost: $75.00 <br /> MATERIALS: <br /> NO. DESCRIPTION UNIT UNITS UNIT COST TOTAL COST <br /> 1 Delete Concrete Floor. LS 3.00 ($110.00) ($330.00) <br /> 2 Delete 12"spool with weep ring assembly LS 3.00 ($350.00) ($1,050.00) <br /> 3 $0.00 <br /> 4 $0.00. <br /> 5 $0.00 <br /> 6 • $0.00 <br /> 7 $0.00 <br /> 8 - $0.00 <br /> 9 $0.00 <br /> 10 $0.00 <br /> Total Material Cost: ($1,380.00) <br /> Page 1 of 2 <br /> 18 i <br />