My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amend 3 ICF Jones & Stokes Inc
>
Contracts
>
6 Years Then Destroy
>
2019
>
Amend 3 ICF Jones & Stokes Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 1:59:05 PM
Creation date
4/7/2017 1:59:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
ICF Jones & Stokes Inc
Approval Date
2/22/2017
Council Approval Date
2/15/2017
End Date
6/30/2019
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Amendment 3
Amendment/Change Order
Amendment
Amendment/Change Order Number
3
Total Compensation
$86,328.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Task 23:As-Built Report <br /> Per EPWD request, ICF has included the as-built report documentation as per the November 2016 <br /> Habitat Mitigation and Monitoring Plan submitted to the Corps for approval of the advance mitigation <br /> credits generated from the project.This task includes one field day(10 hours including travel)for two <br /> biologists to document and map the extent and nature of vegetation remaining on the site after <br /> construction,capture photo points as per the HMMP,coordinate a vendor to fly an aerial photo of the <br /> site post construction (—October 2018 conditions permitting)and write a summary report including <br /> aerial photo based graphics,for EWPD to submit to the Corps. <br /> Deliverables: <br /> • Draft As-Built Report to EPWD as WORD document, one round of compiled review and edits in <br /> track changes;final report as PDF to EPWD for submittal to the Corps <br /> Assumptions: <br /> 1. EPWD will contract separately for professional survey of the mitigation site boundaries and <br /> supply ICF with elevations from the construction contractor or EPWD-contracted survey, per the <br /> HMMP. <br /> 2. Extent and nature of site vegetation will be based on field notes and aerial photo;formal <br /> vegetation monitoring would not occur until Year 1 performance monitoring(not included in <br /> this SOW). <br /> Cost Estimate <br /> The total cost for the 12th Street design and permitting and DD5 tasks identified above is presented in <br /> the attached cost estimate(Exhibit B)and will be billed on a time and materials, not-to-exceed basis. <br /> ICF will track and report budget and billed hours by task, but will manage the project on a total budget <br /> basis. <br /> The cost estimate presumes approximately$37,497 of the total tasks(Task 17 including related final <br /> plan printing and delivery expenses)will be accomplished prior to March 31, 2017 when 2016 effective <br /> rates are modified to reflect 2017 rates;all other tasks would be accomplished under updated 2017 <br /> rates.Thus approximately 57%of the work would be in the'next year'and the 3% labor escalation is <br /> calculated based on this assumption. <br /> Schedule <br /> Based on our long working relationship with EPWD, ICF will continue to work to complete the 99%and <br /> final PS&E package while this amendment is being processed for approval. Schedule incorporates <br /> assumptions listed in tasks above and assumes signed amendment and Notice to Proceed no later than <br /> January 31,2017. <br />
The URL can be used to link to this page
Your browser does not support the video tag.