My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/08/12 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/08/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 8:32:11 AM
Creation date
4/10/2017 8:31:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WFP Portal 4 & 6 Area Security Improvements <br /> Change Order No.1 <br /> Change Order Effective Date: July 24, 2009 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. In full and complete compensation for the changes described in Exhibit A, including all <br /> direct and indirect costs and impacts, the contract price shall be adjusted as described <br /> in this Change Order. <br /> 3. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 4. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Manager Project Engineer (if Engineering Manager Department Director <br /> (if applicable) applicab e) zá- . <br /> • licable) <br /> 1 / <br /> Date: 712g/07 Date: /2/O? pate: 7 ..2 d9 Date:2-2-4/—C1 <br /> CONTRACTOR <br /> By-- Date: �c,t C. 2.3 Z0°'1 <br /> /rfZEs <br /> Officer <br /> Page 2of4 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.