My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/08/12 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/08/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 8:32:11 AM
Creation date
4/10/2017 8:31:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br /> existing conduit underground pull out the existing conductors, provide temporary connections, <br /> and install new conduit from underground into the vault. <br /> 6. This item justifies the difference between tons of imported fill called for in the Contract and the <br /> actual tons needed to complete the work. <br /> 7. This item justifies the difference between the number of 2-man split face rock called for in the <br /> Contract and the actual number of rock needed to complete the work <br /> CONTRACT TIME: <br /> Fourteen days were added to the Contract for the additional work needed to switch the existing <br /> manually operated butterfly valve and motor operated butterfly valve and change the location of the <br /> precast vault. Seventeen days were added to the project due to inclement weather making work on the <br /> site impossible. The project was at Substantial Completion within the extended Contract time. The <br /> Contractor was then given permission to wait until it was convenient and prudent to come back to the <br /> site to do final landscaping. <br /> 19 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.