E <br /> existing conduit underground pull out the existing conductors, provide temporary connections, <br /> and install new conduit from underground into the vault. <br /> 6. This item justifies the difference between tons of imported fill called for in the Contract and the <br /> actual tons needed to complete the work. <br /> 7. This item justifies the difference between the number of 2-man split face rock called for in the <br /> Contract and the actual number of rock needed to complete the work <br /> CONTRACT TIME: <br /> Fourteen days were added to the Contract for the additional work needed to switch the existing <br /> manually operated butterfly valve and motor operated butterfly valve and change the location of the <br /> precast vault. Seventeen days were added to the project due to inclement weather making work on the <br /> site impossible. The project was at Substantial Completion within the extended Contract time. The <br /> Contractor was then given permission to wait until it was convenient and prudent to come back to the <br /> site to do final landscaping. <br /> 19 <br /> Page 4 of 4 <br />