My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/08/12 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/08/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 8:32:11 AM
Creation date
4/10/2017 8:31:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: Consent COUNCIL BILL# <br /> Amendment No. 1 to the Action Originating Department Public Works <br /> Professional Services First Reading Contact Person Mark Sadler <br /> Agreement with Northwest Second Reading Phone Number 425-257-8967 <br /> Corrosion Engineering for Third Reading FOR AGENDA OF Aug. 12, 2009 <br /> Engineering Services Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA 416 <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Budget Comm. 2/26/08 Amendment No. 1 <br /> Council 3/5/08 <br /> Amount Budgeted $25,000. <br /> Expenditure Required -0- Account Number(s)401-5-200-118-673-410 (UP-3138) <br /> Budget Remaining 21,000. <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This contract allows Northwest Corrosion to assist the Public Works Department with a variety of cathodic <br /> protection projects on the water pipelines, including assistance with pipeline#4 Bonding Project design 2010 <br /> construction; groundbed design for additional impressed current cathodic protection systems along water <br /> transmission piping 2, 3, and 4 right-of-way;pipeline#5 continuity testing; Rucker Hill transmission piping, <br /> field testing and cathodic protection system design; and operational support for the City of Everett corrosion <br /> control systems. <br /> This Amendment only extends the completion date to December 31, 2010, at no additional cost. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 with Northwest Corrosion Engineering for engineering <br /> services. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.