My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/08/12 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/08/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 8:32:11 AM
Creation date
4/10/2017 8:31:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> AMENDMENT NO.1 TO PROFESSIONAL SERVICES AGREEMENT BETWEEN <br /> THE CITY OF EVERETT <br /> AND <br /> NORTHWEST CORROSION ENGINEERING <br /> WHEREAS,Northwest Corrosion Engineering,and the City entered into an Agreement dated March <br /> 6, 2008, ("Agreement")to provide professional corrosion and coating related engineering and other <br /> consulting services to the City related to the Utilities Department and their steel utility transmission <br /> lines; and <br /> WHEREAS,the City continues to need professional corrosion engineering and other consulting <br /> services related to the Utility for continuous operations and protection of our corrosion susceptible <br /> pipelines and structures; and <br /> WHEREAS,the City and Northwest Corrosion Engineering.,agree to amend their Agreement to: (a) <br /> modify the scope as attached to make current;and(b)extend the time for completion from December <br /> June 30,2009 to December 31,2010. <br /> NOW THEREFORE, the City of Everett and Northwest Corrosion Engineering, agree to amend and <br /> modify the previously amended Agreement as follows: <br /> 1. The Scope of Work as described in Exhibit A of the Agreement is modified per the attached <br /> Exhibit A of this amendment. <br /> 2. Paragraph 3,Time of Beginning and Completion of Performance, is modified to read as <br /> follows: <br /> "This Agreement shall commence as the date of execution of this Agreement and shall be <br /> completed by December 31, 2010." <br /> All terms, conditions and provisions of the Agreement remain in full force and effect except as <br /> expressly modified by this Amendment. <br /> C:\Doaiments and Settings\CompagAdmioistntoALocal Settings\Temporary Internet Files10LKl87D\NW Corr Amendment No 1072309.doc <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.