Laserfiche WebLink
❑100 amp bus/100 amp main OCPD- 3,840 AC watts,maximum 20 amp inverter OCPD, <br /> 0Other-Electrical Permit with Plan Review Required <br /> Note X:(,fisted un-altered factory moln/bus combination.Alteration of the panelboard main OCPD will require plan review. <br /> Note 2:The circuit conductors and overcurrent devices shall be sized to carrynot less than 125 percent of the maximum currents <br /> ds calculated in 690.8(A).The rating orsetting of overcurrent devicesshall be permitted in accordance with 240.4(8)and(Q.NEC <br /> 690.8(8)(1) <br /> Note 3:if a panelboard employs a snap switch rated 30 amperes or less in any branch circuit it cannot be rated more than 200 <br /> amperes unless there Is a supply side overcurrent protection at 200 amperes or less within the panelboard.This requirement does <br /> not apply to panelboards equipped with circuit breakers.Section 408.36(A)of the NEC. <br /> [7. 1ve attached the following Electrical OneLine Diagram: <br /> tandard Electrical Diagram-6 Strings or Less <br /> �andard Electrical Diagram-4 Strings or Less <br /> tandard Electrical Diagram-Micro Inverter <br /> one of the above-Electrical Permit with Pian Review Required <br /> ts: <br /> r - If you answered yes to all of the above questions,yaur project qualifies for over the Over-the- <br /> Counter electrical permit. <br /> I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws <br /> and ordinances governing this type of work will be completed whether specified herein or not. The granting of a permit does <br /> not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the <br /> performance of construction. That 1 am authorized by the owner of this property to perform the work for which application is <br /> made and I comply with the State Contractors Law 18.27 RCW and 296.200 WAC. <br /> Applicant Signature: <br /> Date: <br /> Applicant Name(Please Print): i <br /> Zito <br /> --------TO BE COMPLETED BY CITY STAFF------ <br /> Qualifies far OTC Building Permit? Yes ON �P!rmltAplication#: <br /> Staff Initials Date: (� t� ( Q'f —Of <br /> Qualifies for Electrical OTC? s �DN4o Permit#StaffInitlals Date: <br /> (p Q <br />