Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1996 TO 2001 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 6 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC LOCAL ACCESS Resolution No. <br /> F P PROJECT IDENTIFICATION I T I U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A.FEDERAL AID ROUTE NO. p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.BRIDGE NO. r T t a n I o PROJECT MONTH/Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.PROJECT TITLE o y u I g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR,RNV <br /> N a i N D.STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. ; <br /> L s t o E.TERMINAL BEGINNING AND END .e h y s STARTS Phase UATA 6th Y/N <br /> s v. F.DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 1 A.VARIOUS ROUTES 03 00 0 PE 3/96* _ EIS: No <br /> B.N/A F R/W _ CE:X <br /> C.ANNUAL STREET OVERLAY PROGRAM & CONST 7/96* 640 STP(U) EA: DATE: <br /> D.VARIOUS STREETS WITHIN THE CITY LIMITS S TOTAL 640 2360 3000 500 500 500 1500 N/A: <br /> E.IBID. <br /> F.STREET RESURFACING <br /> 19 2 A.VARIOUS ROUTES 12 00 C PE 3/93 EIS: Yes <br /> B.N/A 06 F T R/W 9/94 CE:X <br /> C.NEIGHBORHOOD MITIGATION SIGNAL PROJECTS P CONST 3/95 337 CMAQ EA: DATE: <br /> D.SEVEN LOCATIONS WITHIN THE CITY LIMITS TOTAL 337 _ 53 390 250 N/A: 12/94 <br /> E.IBID. <br /> F.DESIGN AND CONSTRUCT PED AND VEHICLE SIGNAL IMPR. - _ <br /> 19 3 A.VARIOUS ROUTES 06 00 C PE 3/92 EIS: <br /> B.N/A 12 F T RNV CE: <br /> C.NEIGHBORHOOD TRAFFIC MITIGATION PROJECTS P CONST 5/93 EA: DATE: <br /> D.VARIOUS LOCATIONS WITHIN THE CITY LIMITS 0 TOTAL 2083 2083 600 N/A: <br /> E.IBID. <br /> F.INSTALL TRAFFIC ENHANCEMENTS IN NEIGHBORHOODS <br /> 19 4 A.N/A 06 00 PE EIS: <br /> B.N/A 12 F R/W 2/94 CE: <br /> C.BOEING MITIGATION PARK AND RIDE LOT PROJECTS 21 CONST 5/94 EA: DATE: <br /> D.VARIOUS LOCATIONS INSIDE AND OUTSIDE CITY LIMITS TOTAL 1537 1537 200 200 200 400 N/A: <br /> E. IBID. <br /> F.ESTABLISH P/R LOTS TO SERVE SW EVERETT COMMUTERS <br /> 19 5 A.VARIOUS ROUTES 06 00 00 PE 1/96* EIS: <br /> B.N/A 12 F RNV CE: <br /> C.PEDESTRIAN IMPROVEMENTS CONST 6/96* EA: DATE: <br /> D.VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL _ 300 300 50 50 50 150 N/A: <br /> E.IBID. <br /> F.DESIGN AND CONSTRUCT PATHWAYS&CURB RAMPS _ <br /> 19 6 A.VARIOUS ROUTES 06 00 00 PE 1/96' EIS: NO <br /> B.N/A 12 S RNV CE:X <br /> C.NEIGHBORHOOD BLOCK GRANT PROJECTS CONST 5/96* 360 OTHER EA: DATE: <br /> D.VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL 360 360 60 60 60 180 N/A: <br /> E.IBID. <br /> F.CONSTRUCT PUBLIC IMPROVEMENTS IN NEIGHBORHOODS <br /> 19 7 A.VARIOUS ROUTES 12 00 00 PE 1/96* EIS: <br /> B.N/A P RNV CE: <br /> C.PAVEMENT MARKING PROJECTS CONST 5/96* EA: DATE: <br /> D.VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL 480 480 80 80 80 240 N/A: <br /> E.IBID. <br /> F.INSTALL PAVEMENT MARKING IN VARIOUS LOCATIONS <br /> A portion or all of the funding for these projects has not yet been committed. <br /> NOTE "Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />