My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4138
>
Resolutions
>
Resolution 4138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 11:09:19 AM
Creation date
4/11/2017 11:09:02 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4138
Date
7/12/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1996 TO 2001 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 5 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC COLLECTOR ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A.FEDERAL AID ROUTE NO. p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.BRIDGE NO. r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T1 r C.PROJECT TITLE o y u 1g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR.RM/ <br /> N a i N D.STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o E.TERMINAL BEGINNING AND END .e h y s STARTS Phase UATA 6th Y/N <br /> s y. F.DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 17 1 A.2784 04 0.8 C PE 2/96 EIS: <br /> B.N/A 06 P P RAN 5/96 CE: <br /> C.75TH STREET IMPROVEMENTS 12 0 CONST 9/96 EA: DATE: <br /> D.75TH STREET T TOTAL OTHER 100 227 327 327 N/A: <br /> E.BEVERLY LANE TO EVERGREEN WAY <br /> F.DESIGN AND CONSTRUCT ROAD WIDENING,IMPROVEMENT <br /> 17 2 A.2784 04 0.8 C PE 2/2000' EIS: <br /> B.N/A 06 P P RAN CE: <br /> C.75TH STREET IMPROVEMENTS 12 0 CONST EA: DATE: <br /> D.75TH STREET T TOTAL OTHER 100 600 100 N/A: <br /> E.EVERGREEN WAY TO BEVERLY BLVD. <br /> F.DESIGN AND CONSTRUCT ROAD WIDENING,IMPROVEMENT <br /> 17 3 A.VARIOUS 31 0.9 C PE 4/97' EIS: <br /> B.N/A P P R/W CE: <br /> C.COLLECTOR ARTERIAL NEEDS STUDY 0 CONST EA: DATE: <br /> D.VARIOUS LOCATIONS T TOTAL 50 50 50 N/A: <br /> E.VARIOUS LOCATIONS <br /> F.STUDY ULTIMATE COLLECTOR ARTERIAL IMPROVEMENTS <br /> 17 4 A.2795 01 0.3 C PE 11/97* EIS: <br /> B.N/A 08 P P RAN 1/98' CE: <br /> C.RIVERSIDE INDUSTRIAL PARK ACCESS BRIDGE 0 CONST 7/98' EA: DATE: <br /> D.VICINITY OF 1-5 AND E.MARINE VIEW DRIVE T TOTAL OTHER 1000 4400 5400 400 5000 N/A: <br /> E.EAST MARINE VIEW DRIVE TO SNOHOMISH RIVERFRONT <br /> F.DESIGN AND CONSTRUCT BRIDGE ACCESS TO RIVERFRON <br /> •A portion or all of the funding for these projects has not yet been committed. <br /> NOTE:"Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.