My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4138
>
Resolutions
>
Resolution 4138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 11:09:19 AM
Creation date
4/11/2017 11:09:02 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4138
Date
7/12/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1996 TO 2001 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 8 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC LOCAL ACCESS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A.FEDERAL AID ROUTE NO. p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.BRIDGE NO. r T t a n I o PROJECT MONTH!Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.PROJECT TITLE o y u I g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR.RAN <br /> N a i N D.STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o E.TERMINAL BEGINNING AND END .e h y s STARTS Phase UATA 6th Y/N <br /> $ y. F.DESCRIBE WORK TO BE DONE OTHER DATE , <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ', <br /> 19 13 A.VARIOUS ROUTES 12 00 00 PE EIS: <br /> B.N/A 06 P R/W CE <br /> C.ROADWAY HAZARD ELIMINATION CONST 5/96* EA: DATE: <br /> D.VARIOUS LOCATIONS TOTAL _ 120 120 20 20 20 60 N/A: <br /> E.IBID. _ <br /> F.REMOVE AND/OR MODIFY ROADSIDE HAZARDS <br /> 19 14 A.VARIOUS ROUTES 31 00 00 PE 2/96` _ EIS: <br /> B.N/A P RAN CE: • <br /> C.NEIGHBORHOOD TRAFFIC STUDIES CONST _ EA: DATE: <br /> D.PORT GARDNER,NORTHWEST,AND OTHERS TOTAL 70 70 70 N/A: <br /> E.IBID. <br /> F.STUDY TRAFFIC TRENDS,RECOMMEND IMPROVEMENTS <br /> 19 15 A.VARIOUS ROUTES 32 F, 00 P PE 7/95* 131 CMAQ/STP(U) EIS: YES <br /> B.N/A12 S, 0 R/W 10/95* CE:X <br /> C.EVERETT NONMOTORIZED TRAIL SYSTEM & CONST 5/96* 515 CMAQ EA: DATE: <br /> D.VARIOUS LOCATIONS P TOTAL 646 129 1284 684 200 200 200 N/A: <br /> E.IBID. <br /> F.DESIGN AND CONSTRUCT PED/BIKE PATHS,BIKE LANES <br /> 19 16 A.0099,0529,2791,2776,2777,ETC. 06 00 00 PE 3/96* EIS: <br /> B.N/A 17 P RAN CE: <br /> C.CITY ENTRYWAY LANDSCAPING AND SIGNS CONST 7/96* EA: DATE: <br /> D.VARIOUS ENTRYWAY CORRIDORS W/IN CITY LIMITS TOTAL 150 150 25 25 25 75 N/A: <br /> E.IBID. <br /> F.SPECIAL LANDSCAPING AND SIGNS FOR CITY'S ENTRYWAYS <br /> A portion or all of the funding for these projects has not yet been committed. <br /> NOTE "Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.