Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM, 1996 TO 2001 <br /> Agency: City of Everett <br /> City No.: 0420 Hearing Date Pg 9 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC TRANSIT PROJECTS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m T o L t FEDERAL FUNDING FEDERALLY <br /> N i A. PROJECT TITLE p A t o i C EXPENDITURE SCHEDULE FUNDED <br /> C C o B. STREET/COUNTY ROAD NAME OR NUMBER r T T a n 1 o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T 1 r C. TERMINAL BEGINNING AND END o y U 1 g id PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIRON R/W <br /> N a i N D. DESCRIBE WORK TO BE DONE v p S t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ? <br /> L s t o . e h y s STARTS Phase UATA 6th, <br /> s y OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> O 1 A. Paratransit Vehicles (Replacement) PE EIS: <br /> B. 2 in 1996 21 F 0 t{/Kr, Jul-96 S9 96 24 120 120 CE: x <br /> C. CONST EA: DATE <br /> D. TOTAL NA: <br /> E. <br /> F. <br /> O 1 A. Buses (Replacement) PE EIS: <br /> B. 6 in 1996 21 F 0 RW,,;,�;;;•ij Jul-96 S9 1,184 296 1,400 1,400 CE:X <br /> C. CONST EA: DATE <br /> D. TOTAL NA: <br /> E. <br /> F. <br /> O 1 A. Buses (Replacement) PE EIS: <br /> B. 15 in 1999 21 P 0 Jul Jul-99 Other 3,600 900 4,500 4,500 CE: x <br /> C. CONST EA: DATE <br /> D. TOTAL - NA: <br /> E. <br /> F. <br /> O 1 A. Paratransit Vehicles (Replacement) PE EIS: <br /> B. 5 in 1997 and 4 in 1998 21 P 0 R/WJul-99 Other 520 130 650 350 300 CE: X <br /> C. CONST EA: DATE <br /> D. TOTAL NA: <br /> E. <br /> F. _ <br /> 0 1 A. Operating Assistance 22 P 0 PE EIS: <br /> B R/W CE: x <br /> C. Cg9QS'L'„i Jul-96 59 1,500 1,500 3,000 500 500 500 1,500 EA: DATE <br /> D. TOTAL NA: <br /> E. <br /> F. <br />