My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4138
>
Resolutions
>
Resolution 4138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 11:09:19 AM
Creation date
4/11/2017 11:09:02 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4138
Date
7/12/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT �, , <br /> 1996 TO 2001 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN <br /> Interstates and Freeways 5. Pedestrian Improvements <br /> 6. Neighborhood Block Grant <br /> 1. SR 526/Evergreen Way Overcrossing 7. Pavement Markings <br /> 2. 1-5 HOV Lanes(164th to SR 526) 8. Everett Avenue Signals <br /> 3. SR 526 HOV Lane(I-5 to 34th Avenue) 9. Signal Master&Interconnect <br /> 4. I-5 HOV Lanes(SR 526 to SR 2) 10. Interim Traffic Signals <br /> 5. 41st Street Interchange/Ramps 11. Developer Signals <br /> 6. HOV Treatment of SR 96/1-5 Interchange 12. HES Projects <br /> 7. Interchange Studies and Improvements 13. Roadway Hazard Elimination <br /> 14. Neighborhood Traffic Studies <br /> Principal Arterials 15. Everett Nonmotorized Trail System <br /> 16. City Entryway Landscaping and Signs <br /> 1. Paine Field Blvd./SR 525 Corridor <br /> 2. 19th Avenue SE Transit <br /> 3. Evergreen Way(108th to 112th) <br /> 4. Evergreen Way(Ttereve to Pecks) 1. Paratransit Vehicle Replacements(1996) <br /> 5. Evergreen Way(Pecks to 52nd) 2. Bus Replacements(1996) <br /> 6. E. Marine View Dr. (Alverson to N. Broadway) 3. Bus Replacements(1999) <br /> 7. Airport Road HOV Lanes 4. Paratransit Vehicle Replacements(1997-2000) <br /> 8. Everett Avenue(Norton to Waterfront) 5. Transit Operating Assistance <br /> 9. East Marine View Drive(N. Broadway to I-5) 6. Transit Facility Improvements <br /> 10. Mukilteo Blvd./41st Street Corridor 7. Regional Pass System Planning <br /> and Pedestrian Study 8. Buses For Expansion; 1997-2000 <br /> 11. 41st Street 9. Bus Stop Improvements <br /> 12. Arterial Needs Study 10. Security Equipment <br /> 13. Paine Field Blvd.Extension Studies 11. Electronic Farebox Equipment <br /> 14. SR 525 HOV Lanes 12. Fixed-route Automated Scheduling <br /> 15. SR 96 HOV Lanes 13. Operations Support Vehicles <br /> 14. Transit O&M Facility <br /> Minor Arterials <br /> HOV Projects <br /> 1. Madison Street <br /> 2. 112th Street 1. Multimodal Transportation Facility(II) <br /> 3. 100th Street SE 2. Multimodal Transportation Facility(II) <br /> 4. 4th Avenue West 3. Multimodal Transportation Facility(III) <br /> 5. Seaway Boulevard 4. SR 99 Transit Priority/HOV Treatment <br /> 6. 100th Street SW 5. Evergreen Way Transit/HOV Treatment <br /> 6. Park and Ride Facilities <br /> Collector Arterials 7. South Everett Transit Center(I) <br /> 8. South Everett Transit Center(II) <br /> 1. 75th Street(Beverly Lane to Evergreen Way) 9. South Everett Transit Center(III) <br /> 2. 75th Street(Evergreen Way to Beverly Blvd.) 10. North Everett Transit Center(I) <br /> 3. Collector Arterial Needs Study 11. North Everett Transit Center(II) <br /> 4. Riverside Industrial Park Bridge <br /> Other Transportation-related Projects <br /> Local Access <br /> 1. Innovative Employer Programs <br /> 1. Annual Street Overlays 2. Increased Rideshare Subsidies <br /> 2. Neighborhood Mitigation Signal Projects 3. CTR Implementation of State CTR Law <br /> 3. Neighborhood Traffic Mitigation Projects 4. Bicycle and Pedestrian Plan <br /> 4. Boeing Mitigation Park&Ride Lots 5. Regional Transit Investments <br />
The URL can be used to link to this page
Your browser does not support the video tag.