Laserfiche WebLink
CITY OF EVERETT <br /> 1996-2001 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN SUMMARY <br /> PROJECT PROJECT PE RAN CONST. '95-2000 Lead Map <br /> TYPE PRIORITY NAME TERMINI START START START COST Agency No. <br /> Interstates and Freeways _ 1 SR 526/Evergreen Way Overcrossing SR 526 at Evergreen Way 3/96 8/96 $1,500,000 EVT 1 <br /> Interstates and Freeways 2 1-5 HOV Lanes 164th to SR 526 3/93 8/98 2/99 $25,000,000 * WSDOT 2 <br /> Interstates and Freeways 3 SR 526 HOV Lane 1-5 to 34th Avenue 5/98 _ 2/2000 $25,000,000 * WSDOT 3 <br /> Interstates and Freeways 4 1-5 HOV Lanes SR 526 to SR 2 8/98 2/2001 $25,000,000 ' WSDOT 4 <br /> Interstates and Freeways 5 41st Street Ramp/Interchange Imprs. Broadway to Interstate 5 5/98 2/99 _ $1,500,000 ' WSDOT 5 <br /> Interstates and Freeways 6 HOV Treatment of SR 96/1-5 Interchange 128th Street S.E./I-5 Interchange 3/94 6/97 $1,800,000 WSDOT 6 <br /> Interstates and Freeways , 7 Interchange Studies and Improvements t-5/12th1-5/Pacific:1-5/SR 2,etc. 3/98 $500,000 ' _ EVT 7 <br /> Principal Arterials 1 SR 525/Paine Field Blvd.Projects SR 526 to SR 99 12/91 9/95 , 9/96 $69000,000 ' WSDOT 8 <br /> Principal Arterials 2 19th Avenue SE(SR 527) 112th Street to 132nd Street , 1/93 9/96 3/97 $7,300,000 ' EVT _ 9 <br /> Principal Arterials 3 Evergreen Way 108th Street to 112th Street , 10/95 2/96 7/96 $434,000 EVT 10 <br /> Principal Arterials 4 Evergreen Way Ttereve to Pecks 10/95 2/96 7/96 $1,034,000 EVT 11 <br /> Principal Arterials 5 Evergreen Way Pecks Dr.to 52nd Street 10/96 2/97 7/97 $1,000,000 EVT 12 <br /> Principal Arterials 6 East Marine View Drive Alverson Bridge to N.Broadway 11/95 10/96 7/97 $3,113,000 * EVT 13 <br /> Principal Arterials 7 Airport Road HOV Lanes Casino Road to SR 99 10/94 1/95 3/96 $4,450,000 SNO CTY 14 <br /> Principal Arterials 8 Everett Avenue Improvements Norton Avenue to Waterfront 3/98 5/99 $1,900,000 ' EVT/PORT 15 <br /> Principal Arterials 9 East Marine View Drive N.Broadway to I-5 3/98 5/99 $1,000,000 ' EVT 16 <br /> Principal Arterials 10 Muk.Blvd./41st St.Corr./Ped.Study Broadway to Dogwood/Olympic 2/97 $100,000 ' EVT 17 <br /> Principal Arterials 11 41st Street Rucker Ave.to Friday Ave. 5/97 8/97 2/98 $982,000 * EVT 18 <br /> Principal Arterials 12 Arterial Needs Study Seaway.Broadway,112th,etc. 5/97 $250,000 ` EVT No map <br /> Principal Arterials 13 Paine Field Blvd.Ext.Study SR 526 to Mukilteo waterfront 6/99 $1,000,000 MUK 19 <br /> Principal Arterials 14 SR 525 HOV Lanes SR 99 to 1-5 3/93 10/97 $10,100,000 * WSDOT 20 <br /> Principal Arterials 15 SR 96 HOV Lanes 1-5 to Dumas Road 3/95 4/96 6/97 $2,700,000 SNO CTY 21 <br /> Minor Arterials 1 Madison Street East Cady to Rainier 2/93 7/95 9/95 $300,000 EVT 22 <br /> Minor Arterials 2 112th Street 1-5 to SR 525 2/93 1/96 3/97 $15,700,000 * SNO CTY 23 <br /> Minor Arterials 3 100th Street SE 19th Avenue to 35th Avenue 4/94 9/95 6/97 $1,700,000 SNO CTY 24 <br /> Minor Arterials 4 4th Avenue West Hardeson Road to Holly Drive 9/2000 $100,000 * SNO CTY 25 <br /> Minor Arterials 5 Seaway Blvd. 75th Street to 36th Street 2/98 9/98 5/99 $2,000,000 ' EVT 26 <br /> Minor Arterials 6 100th Street SW Airport Rd to Evergreen Way 2/2000 $200,000 ' SNO CTY 27 <br /> Collector Arterials 1 75th Street Improvements Beverly Lane to Evergreen Way 3/96 6/96 9/96 $327,000 EVT 28 <br /> Collector Arterials 2 75th Street Improvements Evergreen Way to Beverly Blvd. 2/2000 $100,000 * EVT 29 <br /> Collector Arterials 3 Collector Arterial Needs Study Various Locations 4/97 $50,000 * EVT No map <br /> Collector Arterials 4 Riverside Industrial Park Access Bridge Vicinity of 1-5 and E.Marine View Dr. 11/97 1/98 7/99 $5,400,000 ' EVT 30 <br /> Local Access 1 Annual Street Overlays Various streets within city 3/96 7/96 $3,000,000 ' EVT No map <br /> Local Access 2 Neighborhood Mitigation Signals Various locations within city 3/93 9/94 3/95 $250,000 EVT 31 <br /> Local Access 3 Neighborhood Mitigation Projects Various locations within city 5/93 $600,000 EVT 32 <br /> Local Access 4 Boeing Mitigation P/R Lots Various locations within city 2/94 5/94 $1,000,000 EVT No map <br /> Local Access 5 Pedestrian Improvements Various locations within city 1/96 5/96 $300,000 EVT No map <br /> Local Access 6 Neighborhood Block Grants Various locations within city 1/96 5/96 $360,000 EVT No map <br /> Local Access 7 Pavement Marking Projects Various locations within city 1/96 5/96 $480,000 EVT No map <br /> Local Access 8 Everett Avenue Signals Various Everett Avenue Signals 1/97 6/97 $400,000 ` EVT 33 <br /> Local Access 9 Signal Master&Interconnect Various locations within city 5/95 $870,000 ' EVT No map <br /> Local Access 10 Interim Traffic Signals Various locations within city 1/96 6/96 $900,000 EVT No map <br /> Local Access 11 Developer Signals Various locations within city 3/97 10/97 8600,000 ' EVT 34 <br /> Local Access 12 HES Projects Various locations within city 2/96 8/96 $550,000 ' EVT 35 <br /> Local Access 13 Roadway Hazard Elimination Various locations within city 5/96 $120,000 * EVT No map <br /> Local Access 14 Neighborhood Traffic Studies Various locations within city 2/96 $70,000 ' EVT No map <br /> Local Access 15 Everett Nonmotorized Trail System Various locations within city 7/95 10/95 5/96 $1,284,000 ' EVT 36 <br /> Local Access 16 City Entryway Landscaping and Signs Entryway corridors within city 3/96 7/96 $150,000 ' EVT No map <br /> Transit Projects 1 Paratransit Vehicle Replacements(1996) N/A $120,000 ET No map <br /> Transit Projects 1 Bus Replacements(1996) N/A $1,480,000 ET No map <br /> Transit Projects 1 Bus Replacements(1999) N/A $4,500,000 ET No map <br /> Transit Projects 1 Paratransit Vehicle Replacements(1997-200 N/A $715,000 ET No map <br /> Transit Projects 1 Transit Operating Assistance N/A $1,500,000 ET No map <br /> Transit Projects 1 Regional Pass System Planning N/A 2/95 $219,000 Metro No map <br /> Transit Projects 1 Buses for Service Expansion:1997-2000 N/A $6,630,000 ET No map <br /> Transit Projects 2 Bus Stop Improvements N/A $200,000 ET No map <br /> Transit Projects 2 Security Equipment N/A $100,000 ET No map <br /> Transit Projects 2 Electronic Farebox Equipment N/A $200,000 ET No map <br /> Transit Projects 3 Fixed Route Automated Computer Schedulin N/A $25,000 ET No map <br /> Transit Projects 3 Operations Support Vehicles N/A $80,000 ET No map <br /> Transit Projects 2 Transit O&M Facility Not Determined 7/99 $1,700,000 ET No map <br /> I IOV Projects 1 Multimodal Transportation Facility,Phase II Not Determined 9/95 9/95 $2,730,000 ET No map <br /> HOV Projects 1 Multimodal Transportation Facility,Phase II Not Determined 9/95 9/95 $4,970,000 ET No map <br /> HOV Projects 2 Multimodal Transportation Facility,Phase III Not Determined 7/97 $11,500,000 ET No map <br /> HOV Projects 2 SR-99 Transit Priority/HOV Treatment SR 99 7/99 $2,375,000 ' ET No map <br /> HOV Projects 2 Evergreen Way Transit/HOV Treatment Evergreen Way 7/99 $2,000,000 ' ET No map <br /> HOV Projects 3 Park and Ride Facilities Various Locations $3,000,000 TBD No map <br /> HOV Projects 1 South Everett Transit Center Not Determined 9/95 , $235,000 ET No map <br /> HOV Projects 1 South Everett Transit Center Not Determined 7/97 $3,000,000 ET No map <br /> HOV Projects 1 South Everett Transit Center Not Determined 8/98 $3,000,000 ET No map <br /> HOV Projects 1 North Everett Transit Center Everett Community College 3/96 $175,000 ET No map <br /> HOV Projects 1 North Everett Transit Center Everett Community College 7/97 $1,500,000 ET No map <br /> Other Trans-related Project 2 Innovative Employer Programs(DIME) N/A 6/94 $302,000 ET No map <br /> Other Trans-related Project 2 Increased Rideshare Subsidies N/A , 10/94 $146,000 ET No map <br /> Other Trans-related Project 2 Implementation of State CTR Law N/A $150,000 ET No map <br /> Other Trans-related Project 1 Bicycle and Pedestrian Plan Various Locations 7/96 $100,000 ET No map <br /> Other Trans-related Project 2 Regional Transit Investments Not Determined Unknown ' RTA No map <br /> *A portion or all of the funding for these projects has not yet been committed. <br /> NOTE:Projects shown in bold type were not included in the 1995-2000 Six-year TIP. <br /> 96tipsum.wb2 <br />