Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1996 TO 2001 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 2 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC PRINCIPAL ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> Ur m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A.FEDERAL AID ROUTE NO. p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.BRIDGE NO. r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.PROJECT TITLE o y u I g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR RNV <br /> N a i N D.STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o. E.TERMINAL BEGINNING AND END .e h y s STARTS Phase UATA 6th Y/N <br /> s y F.DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 14 1 A.0525 01 5 C PE 12/91 1027 STP(U) EIS:X Yes <br /> B.N/A 05 F P R/W 9/95* 1000 STP(U) CE: <br /> C.PAINE FIELD BLVD./SR 525 CORRIDOR PROJECTS 06 & 0 CONST 9/96* 1000 STP(U) EA: DATE: <br /> D.PAINE FIELD BLVD.;SR 525 12 S T TOTAL 3027 _ TIA 11600 71500 3000 10000 23000 33000,N/A: 9/95 <br /> E.SR 525,BETWEEN SR 526 AND SR 99 <br /> F.NEW ALIGNMENT;ROADWAY IMPROVEMENTS;NEW INTERCHANGE <br /> 14 2 A.0527 . 04 F 1 C PE 1/93 _ EIS:X Yes <br /> B.N/A 06 & P R/W 9/96• _ CE: <br /> C.19TH AVENUE SE(SR 527)IMPROVEMENTS 12 S 0 CONST 3/97• EA: DATE: <br /> D.19TH AVENUE SE,SR 527 T TOTAL TIA 6584 1216 7800 500 1300 5500 N/A: 6/96 <br /> E.112TH STREET SE TO 132ND STREET SE <br /> F.DESIGN AND CONSTRUCT ADD.LANES;SIGNAL IMP.,SIDEWALKS <br /> 14 3 A.2791,0099 04 0.5 C PE 10/95 EIS:X Yes <br /> B.N/A 06 F P R/W 2/96 CE: <br /> C.EVERGREEN WAY IMPROVEMENTS 12 0 CONST 7/96 EA: DATE: <br /> D.EVERGREEN WAY T TOTAL TIA 217 217 434 434 N/A: 2/96 <br /> E.108TH STREET TO 112TH STREET <br /> F.DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES <br /> 14 4 A.2791 04 0.5 C PE 10/95 _ EIS:X Yes <br /> B.N/A 06 F P RAN 2/96 _ CE: <br /> C.EVERGREEN WAY IMPROVEMENTS 12 0 CONST 7/96 EA: DATE: <br /> D.EVERGREEN WAY T TOTAL UATA 827 207 1034 1034 N/A: 2/96 <br /> E.TTEREVE TO PECKS <br /> F.DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES <br /> 14 5 A.2791 04 0.5 C PE 10/96* EIS:X Yes <br /> B.N/A P P RAN 2/97' CE: <br /> C.EVERGREEN WAY IMPROVEMENTS 0 CONST 7/97* EA: DATE: <br /> D.EVERGREEN WAY 06 T TOTAL UATA 800 200 1000 1000 N/A: 2/96 <br /> E.PECKS TO 52ND STREET 12 <br /> F.DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES <br /> 14 6 A.0529 04 0.9 C PE 11/95 522 STP(U);NHS EIS: Yes <br /> B.N/A 06 F P RAN 10/96* OTHER 2241 350 3113 300 2813 CE:X <br /> C.EAST MARINE VIEW DRIVE IMPROVEMENTS 12 & T CONST 7/97* TIA EA: DATE: <br /> D.EAST MARINE VIEW DRIVE,SR 529 S 0 TOTAL 522 N/A: 10/96 <br /> E.ALVERSON BRIDGE TO NORTH BROADWAY 12 0 <br /> F.DESIGN AND CONSTRUCT ADD.WB LANE;SIDEWALKS;ETC. T <br /> 14 7 A.2586 04 2.25 C PE 10/94 _ EIS: Yes <br /> B.N/A 06 F P RAN 1/95 500 CMAQ _TIA 3250 1450 4700 500 3850 100 CE: <br /> C.AIRPORT ROAD HOV LANES 12 T CONST 3/96 EA:X DATE: <br /> D.AIRPORT ROAD 0 TOTAL 500 N/A: 1/95 <br /> E.CASINO ROAD TO SR 99 <br /> F.COMPLETE HOV LANE PROJECT <br /> 'A portion or all of the funding for these project phases has not yet been committed. <br /> NOTE: "Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />