Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1996 TO 2001 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 1 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC INTERSTATES AND FREEWAYS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N 1 A.FEDERAL AID NO. p a t o i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.BRIDGE NO. r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T1 r C.PROJECT TITLE o y u I g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR.R/W <br /> N a i N D.STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o E.TERMINAL BEGINNING AND END .e h y s STARTS Phase UATA 6th Y/N <br /> s y. F.DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 4 5 , 6 7 8 9 10 11 12 13 14 15 16 , 17 18 19 20 21 <br /> 12 1 A.0526 08 0.2 0 PE 3/96 113 STP EIS: No <br /> B. 04 F R/W 1500 1500 225 1275 CE:X <br /> C.SR 526/EVERGREEN WAY OVERCROSSING 06 CONST 8/96 637 STP EA: DATE: <br /> D.SR 526 AND EVERGREEN WAY TOTAL 750 N/A: <br /> E.EVERGREEN WAY OVERCROSSING <br /> F.DESIGN AND CONSTRUCT WIDENING OF OVERCROSSING 12 , <br /> 11 2 A. 0005 05 5.6 0 PE 3/93 EIS: <br /> B.N/A 06 P RNV 8/98* OTHER 50000 50000 25000 CE: <br /> C.1-5 HOV LANES 12 CONST 2/99* EA: DATE: <br /> D.INTERSTATE 5 TOTAL N/A: <br /> E.164TH STREET S.E.TO SR 526 - <br /> F.DESIGN AND CONSTRUCT MEDIAN HOV LANES <br /> 12 3 A.0526 05 3.2 0 PE 5/98' EIS: <br /> B.N/A 06 P P RNV OTHER 25000 25000 25000 CE: <br /> C.SR 526 HOV LANE 12 CONST 2/2000' _ EA: DATE: <br /> D.SR 526 TOTAL N/A: <br /> E.1-5 TO 34TH AVENUE WEST <br /> F.DESIGN AND CONSTRUCT PERMANENT HOV LANE <br /> 11 4 A. 0005 05 5.6 0 PE 8/98' EIS: <br /> B.N/A 06 P R/W OTHER 50000 50000 25000 CE: <br /> C. 1-5 HOV LANES 12 CONST 2/2001' EA: DATE: <br /> D.INTERSTATE 5 TOTAL N/A: <br /> E.SR526TOSR2 <br /> F.DESIGN AND CONSTRUCT MEDIAN HOV LANES _ , <br /> 11 5 A.2776 03 0.3 0 PE 5/98' _ EIS: <br /> 14 B 05 P RNV UATA CE: <br /> C.41ST STREET RAMP/INTERCHANGE IMPROVEMENTS 10 CONST 2/99* OR EA: DATE: <br /> D.41ST STREET TOTAL ,OTHER 300 1500 230 1270 N/A: <br /> E.BROADWAY TO INTERSTATE 5 <br /> F.RAMP IMPROVEMENTS _ _ _ <br /> 11 6 A.0096 04 0.2 0 PE 3/94" EIS: <br /> 14 B. 06 F RNV CE: <br /> C.HOV TREATMENT OF SR 96/1-5 INTERCHANGE 12 CONST 6/97' EA: DATE: <br /> B.128TH STREET S.E.AND I-5 TOTAL _OTHER 1600 400 2000 1800 N/A: <br /> C.SR 96/1-5 INTERCHANGE _ <br /> D.DESIGN/CONSTRUCT HOV FACILITIES ON RAMPS AND OVERPASS <br /> 11 7 A.2764,0002,ETC. 31 00 0 PE 3/98' EIS: <br /> 12 B. RN/ CE: <br /> 14 C.INTERCHANGE STUDIES AND IMPROVEMENTS CONST EA: DATE: <br /> D. I-5/12TH STREET NE;I-5/PACIFIC STREET;I-5/SR 2;ETC. P TOTAL 500 500 500 N/A: <br /> E.VARIOUS INTERCHANGES <br /> F.STUDY,DESIGN,AND CONSTRUCT INTERCHANGE IMPROVEMENTS <br /> A portion or all of the funding for these project phases has not yet been committed. <br /> NOTE:"Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />