My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering 3/24/2017
>
Contracts
>
6 Years Then Destroy
>
2017
>
HDR Engineering 3/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 1:47:21 PM
Creation date
4/11/2017 1:47:12 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering
Approval Date
3/24/2017
Council Approval Date
3/8/2017
End Date
12/31/2017
Department
Public Works
Department Project Manager
Matt Welborn
Subject / Project Title
Water, Sewer, Surface Water Connection Charge
Tracking Number
0000559
Total Compensation
$57,940.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> City of Everett <br /> Water, Sewer and Surface Water Connection Charge Study <br /> Compensation <br /> Hourly Billing Rates <br /> The following hourly billing rates were used to establish the project fees for this study. <br /> Individual Project Role Hourly Rate <br /> Shawn Koorn Project Manager $250.00/hour <br /> Tom Gould QA/QC $290.00/hour <br /> Judy Dean Manager—Technical Analysis $180.00/hour <br /> Josiah Close Technical Analysis $115.00/hour <br /> Others Project Clerical Support $115.00/hour <br /> Should other HDR individuals be required for this project,they will be billed at their standard <br /> hourly billing rate. The above hourly billing rates will be in effect through December 31, 2017. <br /> HDR adjusts their hourly billing rates at the end of each calendar year and any work performed <br /> after December 31, 2017 shall be at the CY 2018 hourly billing rates. <br /> Project Fees <br /> Given the hourly billing rates and estimated labor hours by task,the total fees for the City's study <br /> could be developed. Provided below in Table 2 is a summary of the total fees for the City's project. <br /> Table 1 <br /> Summary of the Total Fees for the <br /> Water, Sewer and Surface Water Connection Charge Study <br /> Total <br /> Labor: <br /> Task 1: Initial Project Meeting $3,165 <br /> Task 2: Data Collection 2,155 <br /> Task 3:Technical Analysis—Connection Charges 17,880 <br /> Task 4: Review of Assessment Methods for Water and Sewer Connection Fees 4,775 <br /> Task 5: Review of Assessment of Conn.Charges in Cases of Redevelopment 5,275 <br /> Task 6:Written Report 5,780 <br /> Task 7: Project Meetings and Public Presentations 10,030 <br /> Task 8: Project Administration 3,880 <br /> Task 9:Ordinance Development 4,250 <br /> Grand Total Labor $57,190 <br /> Expenses: <br /> Total Expenses $750 <br /> Grand Total"Not to Exceed"Fees S57,940 <br /> Page B-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.