My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering 3/24/2017
>
Contracts
>
6 Years Then Destroy
>
2017
>
HDR Engineering 3/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 1:47:21 PM
Creation date
4/11/2017 1:47:12 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering
Approval Date
3/24/2017
Council Approval Date
3/8/2017
End Date
12/31/2017
Department
Public Works
Department Project Manager
Matt Welborn
Subject / Project Title
Water, Sewer, Surface Water Connection Charge
Tracking Number
0000559
Total Compensation
$57,940.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
advice. The City's proposed/revised Ordinance related to these fees should be reviewed by its <br /> legal counsel. <br /> Deliverables from Task 9— <br /> • Provide assistance in crafting/completing a new Ordinance. <br /> This concludes the proposed scope of services for this addendum. Any additional work outside of <br /> this scope of work will be provided on a time and materials basis. <br /> Project Time Schedule <br /> It is presumed that this study will start or commence in late January or early February. Given that <br /> start date it is estimated that approximately six months will be required to complete the analysis <br /> and written report. In part,this schedule is driven by the impervious surface data. The City <br /> desires to have the study completed no later than September 30, 2017. The agreement will expire <br /> on December 31, 2017. <br /> Page A-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.