in accordance with the Contract. The Owner shall make the final determination of acceptability <br /> and completion. For portions of the Project not previously accepted as substantially complete, the <br /> conditions of guarantee shall commence on the date that the Owner determines the Project is <br /> complete. <br /> ARTICLE 6 CHANGES <br /> 6.1 Owner's Right to Direct Changes to the Work <br /> A. The Owner reserves the right to change the Work at any time. Such changes shall not invalidate <br /> the Contract nor release the surety, and the Contractor agrees to perform the Work as changed. <br /> Among others,these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work, Equipment or material to be provided under this <br /> Contract,and <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment, materials, services, or sites,provided by the Owner, and <br /> 7. Ordering the Contractor to accelerate or Delay Work. <br /> B. If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the <br /> Contract Sum and Contract Time, the Owner may, at its sole option, unilaterally direct the <br /> Contractor to implement any change by notice. The Owner shall not pay or be responsible or <br /> liable for any change implemented by the Contractor without explicit notice from the Owner to <br /> proceed. <br /> 6.2 Extra Work <br /> A. At its sole option, the Owner may (1) perform Extra Work itself, (2) employ others to do it, (3) <br /> direct the Contractor to perform the Extra Work at existing unit bid price, (4) direct the <br /> Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct the <br /> Contractor to perform the Extra Work on a Force Account basis. <br /> 6.3 Change Orders <br /> A. Changes to the Work may result in an increase or decrease in Contract Sum, as provided in 9.2. <br /> Payment For Changes. Requests for an increase in Contract Time must be made as provided in <br /> 5.2.0 Extensions of Contract Time, as applicable. Substantial changes in Contract Time, <br /> Contract Sum or Work will often be negotiated and agreed between the Contractor and Owner <br /> before the Owner directs the Contractor to proceed with the change. <br /> B. If the Contractor and Owner agree on the scope of Work and any changes to Contract Sum and <br /> Contract Time, the Contractor and Owner shall execute an agreed Change Order. However, if the <br /> Contractor and Owner do not agree, the Owner may, in its sole discretion, issue a unilateral <br /> Change Order changing the scope of Work and making any adjustments to the Contract Sum <br /> pursuant to 9.2. Payment For Changes and Contract Time in such amount and for such time as <br /> WFP Operations Building Seismic Retrofit-Rebid January 6,2017 <br /> WO#UP3600 007213 -29 <br />