My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work must comply and conform to applicable building codes in effect when the Work is <br /> performed. <br /> 8.4 Material and Equipment Specified by Name <br /> A. When material or Equipment is specified by reference to patents, brand names, or catalog <br /> numbers,the Owner will not usually consider or approve a substitution. However, the Contractor <br /> may offer substitutions of products it considers to be equal to that specified, but the Owner is not <br /> obliged or required to consider or accept such offered substitution. <br /> 8.5 Requests for Substitution <br /> A. The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The Contractor's <br /> offers of substitution shall be made in writing to the Owner's Representative and shall include <br /> sufficient data to enable the Owner's Representative to assess the acceptability of the material or <br /> Equipment for the particular application and requirements. The Owner and Owner's <br /> Representative are not required or obligated to consider or review a request for substitution and <br /> may, in their sole discretion and option, consider or review such requests. <br /> B. If the offered substitution requires changes to or coordination with other portions of the work, the <br /> Contractor shall include with its substitution request any such drawings and details showing such <br /> changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve <br /> the Contractor from responsibility for the efficiency, quality, and performance of the substitute <br /> material or Equipment, in the same manner and degree as the material and Equipment originally <br /> specified. Any cost differential associated with a substitution shall be reflected in the offer. If <br /> the Owner approves the substitution, the Contract Documents shall be modified by a Change <br /> Order modifying the Contract Sum in the amount of the cost differential. <br /> 8.6 Demonstration of Compliance with Contract Requirements <br /> A. Inspection <br /> 1. The burden of proving the constructed Work complies with the Contract Documents shall be <br /> on the Contractor at all times. To demonstrate its compliance with the Contract <br /> requirements, the Contractor shall assist the Owner's Representative in his or her inspection <br /> and observation of the Work. The Contractor shall grant the Owner's Representative access <br /> to the Work and Work Site, and to places where Work is being prepared, or where materials, <br /> Equipment, or machinery are being obtained for Work. The Contractor shall provide <br /> information requested by the Owner's Representative in connection with inspection work. <br /> 2. If the Contract Documents, laws, ordinances, or any public regulatory authority requires <br /> parts of the Work to be specially inspected, tested, or approved, the Contractor shall give the <br /> Owner's Representative adequate prior written Notice of the availability of the subject Work <br /> for examination,which Notice shall be not less than two (2)working days. <br /> 3. Inspection and quality control tests performed on Work by the Contractor by the Owner's <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of <br /> quality therein and shall not be regarded as an assumption of risks or liability by the Owner's <br /> Representative for the Contractor's compliance with these Contract Documents. Contractor <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 007213 - 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.