My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
remains responsible and liable for all errors, defects or a lack of quality not discovered by <br /> inspection or observation. <br /> 4. If parts of the Work are covered prior to inspection or observation, the cost of exposing the <br /> Work for inspection and closing and re-covering shall be borne by the Contractor regardless <br /> of whether the Work is found to be in compliance with the Contract. <br /> B. Samples of Materials <br /> 1. The Contractor shall provide Samples or specimens of materials to be incorporated in the <br /> Work that require laboratory examination or special testing, as requested by the Owner's <br /> Representative. Such Samples or specimens shall be provided in ample time to permit <br /> making proper test analysis and examinations before the Contractor plans to incorporate the <br /> material into the Work. An independent testing laboratory will conduct tests of material in <br /> accordance with the Specifications. In the absence of a specific test requirement, the <br /> Owner's Representative will determine the appropriate standard test to be used. <br /> C. Certification <br /> 1. In cases where compliance of materials or Equipment to Contract requirements is not readily <br /> determinable through inspection and tests, the Contractor shall provide properly <br /> authenticated documents, certificates, or other proof satisfactory to the Owner's <br /> Representative that the materials and Equipment comply with the Contract requirements. <br /> These documents, certifications, and proofs shall include performance characteristics, <br /> construction materials, and physical or chemical characteristics of materials. The Contractor <br /> shall pay all associated costs of such certification. <br /> D. Inspection at Point of Manufacturing <br /> 1. The Contractor shall be responsible and reimburse the Owner for the costs of inspections, if <br /> inspections occur outside of Whatcom, Skagit, Island, Snohomish, King, Pierce and <br /> Thurston counties if: <br /> a. Inspection and testing of materials or Equipment in the vicinity of the Work by the <br /> Owner is not practicable, or <br /> b. The Contractor requests the Owner to inspect and test material or Equipment at the <br /> point of manufacture, or <br /> c. The Specifications require that inspection, testing or witnessing of tests take place at <br /> the point of manufacture. <br /> 2. Costs to be paid or reimbursed by the Contractor include, but are not limited to, travel, <br /> subsistence, labor and lodging expenses of the Owner's inspector. <br /> E. Testing and Commissioning of Completed Work <br /> 1. Testing and commissioning of all mechanical, electrical, and instrumentation systems and <br /> completed portions of the Work, functioning as a completed system and the complete <br /> Project, functioning as a completed facility, shall be done in accordance with the <br /> Specifications. <br /> F. Storage of Materials and Equipment <br /> 1. Contractor shall store materials and Equipment so as to insure the preservation of their <br /> quality and fitness for the Work. <br /> 2. Stored Equipment and materials shall be located so as to facilitate inspection. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6,2017 <br /> WO#UP3600 007213 - 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.