My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The Contractor shall be responsible for damages, loss or casualty occurring to materials and <br /> Equipment until Final Acceptance. <br /> G. Manufacturer's Directions <br /> 1. Manufactured articles, material and Equipment shall be transported, stored, applied, <br /> installed, connected, erected, adjusted, tested, operated and maintained as recommended by <br /> the manufacturer,unless otherwise specified herein. <br /> 2. Manufacturer's installation instructions and procedures shall be provided to the Owner prior <br /> to installation of the manufactured articles, material and Equipment. <br /> 8.7 Defective Work <br /> A. Correction of Defective Work <br /> 1. When, and as often as the Owner's Representative determines through his or her inspection <br /> procedures, material, Equipment or workmanship incorporated in the Project do not meet the <br /> requirements of the Contract, the Owner's Representative will give written notice of the <br /> noncompliance to the Contractor. Within fourteen (14) days from the receipt of such notice, <br /> the Contractor shall undertake the Work necessary to correct the deficiencies, and to comply <br /> with the Contract. If the Contractor disagrees with the Owner's Representative's <br /> determination and believes that the corrective Work should be covered by a Change Order, <br /> he or she shall immediately notify the Owner, in writing, setting forth its position. Within <br /> five (5) days after receipt of the Contractor's notification, the Owner will review the matter <br /> and notify the Contractor, in writing, of his or her determination. <br /> B. If the Owner determines that the corrective Work is required to comply with the Contract, the <br /> Contractor shall proceed with such Work. As a condition precedent to the Contractor's request <br /> for adjustment of Contract Sum, Contract Time, or both, resulting from the performance of such <br /> corrective Work, the Contractor shall, within fifteen (15) days after receipt of the Owner's <br /> determination, provide the Owner with Notice of a Contract Claim for an adjustment of Contract <br /> Sum, Contract Time, or both. Contract Claims not timely and completely submitted are deemed <br /> waived. The Contractor shall document the cost information associated with the corrective work <br /> with daily records in accordance with Force Account procedures and shall provide such <br /> information to the Owner's Representative daily. Receipt of the cost data by the Owner's <br /> Representative will not be construed to be an acceptance of the corrective Work, or an <br /> authorization for a Change Order to cover the corrective Work. Contractor waives any such <br /> Contract Claim by failing to maintain accurate and complete Force Account records. <br /> C. Retention of Defective Work <br /> 1. In its sole discretion, the Owner may retain Work that is not in compliance with the <br /> Contract. <br /> 2. The Owner will determine the just and reasonable value for such defective Work and <br /> deductions will be made in the payments due or to become due to the Contractor. <br /> 3. Final Acceptance will not act as a waiver of the Owner's right to recover from the Contractor <br /> an amount representing the deduction for retention of defective Work. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6,2017 <br /> WO#UP3600 007213 -36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.