My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kl <br /> Employees. If the Owner's Representative authorizes overtime, the Weighted Wage <br /> Rate shall be determined on the same basis. <br /> 1) The Weighted Wage Rate combines: <br /> a) the current basic wage and fringe benefits the Contractor is required and has <br /> agreed to pay, <br /> b) Federal Insurance Compensation(FICA), <br /> c) Federal Unemployment Tax Act(FUTA), and <br /> d) State Unemployment Tax Act(SUTA) <br /> 2. Travel Allowance and Subsistence <br /> a. This includes the actual costs of allowances for travel or subsistence paid to employees <br /> in the course of their work on the item. This reimbursement will be made only if such <br /> allowances are required by a regional labor agreement or are normally paid by the <br /> Contractor to comparable labor for performing other work. <br /> 3. Industrial Insurance and Medical Aid Premiums <br /> a. The Owner will reimburse Contractor-paid premiums for Marine Industrial Insurance, <br /> for State of Washington Industrial Insurance, and Medical Aid Premiums that become <br /> an obligation of the Contractor and are chargeable to the Force Account Work. The <br /> Owner will not pay the Contractor for Medical Aid premiums that are paid by the <br /> employees. <br /> 4. Overhead and Profit <br /> a. The Owner will pay the Contractor twenty-nine (29) percent of the sum of the costs <br /> listed in a, b, and c above to cover Project Overhead, general company Overhead, <br /> profit,and any other costs incurred. <br /> 9.9 Materials. <br /> A. The Owner will reimburse actual invoice cost for Contractor-supplied materials. <br /> 1. This cost includes actual freight and express charges and taxes, provided that these costs <br /> have not been paid in some other manner under the Contract. <br /> 2. A deduction will be made for any offered or available discounts or rebates if the Owner <br /> has provided the Contractor with the means to comply with the provisions allowing the <br /> discount. <br /> 3. The Owner will then add twenty-one (21) percent of the balance to cover Project <br /> overhead, general company Overhead,profit, and any other cost of supplying materials. <br /> B. To support charges for materials, the Contractor shall provide the Owner's Representative with <br /> authentic, complete and accurate copies of vendor invoices, including freight and express bills. <br /> 1. If invoices are not available for materials from the Contractor stocks, the Contractor shall <br /> certify actual costs by affidavit. <br /> C. If Contract Claims for materials costs are too high, inappropriate, or unsupported by satisfactory <br /> evidence,the Owner's Representative may determine the cost for all or part of the materials. <br /> 1. When determined in this manner, the cost will be the lowest current wholesale price from a <br /> source that can supply the required quantity, including delivery costs. <br /> D. The Owner reserves the right to provide materials. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 007213 -47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.