My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. If so, the Contractor will receive no payment for any costs, Overhead, or profit on such <br /> materials. <br /> 9.10 Equipment. <br /> A. The equipment rates shall be actual cost but shall not exceed the rates set forth in the <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Work is performed, <br /> B. The approval of the Owner's Representative shall be required for the selection of machine-power <br /> tools or equipment prior to their use in Force Account situations. <br /> C. The payment for any machine-power tools or equipment shall be made according to the current <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is <br /> authorized. • <br /> 1. The rates as set forth in the Rental Rate Blue Book (as modified by the current <br /> AGC/WSDOT Equipment Rental Agreement) are the maximum rates allowable for <br /> equipment of modern design and in good working condition. <br /> a. These rates shall be full compensation for all fuel, oil, lubrication, repairs, maintenance, <br /> and all other costs incidental to furnishing and operating the equipment except labor for <br /> operation. <br /> D. The Owner will add twenty-one (21) percent to equipment costs to cover Project Overhead, <br /> general company Overhead (excluding equipment Overhead included in the Rental Rate Blue <br /> Book), and profit. <br /> E. Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental <br /> Agreement will be maintained at each region office of the Washington State Department of <br /> Transportation and at each of the offices of the Associated General Contractors of America, in <br /> Seattle, Spokane, Tacoma, Washington and Wilsonville, Oregon, where they are available for <br /> inspection. <br /> 9.11 For Services. <br /> A. Compensation under Force Account for specialized services shall be made on the basis of an <br /> invoice from the providing entity. <br /> 1. A "specialized service" shall be one that is typically billed through invoice in standard <br /> industry practice. <br /> 2. Before Work is started, the Owner's Representative may require the Contractor to obtain <br /> multiple quotations for the service to be utilized and select the provider with prices and <br /> terms most advantageous to the Owner. <br /> 3. In the event that prior quotations are not obtained and the service invoice is submitted by <br /> the Subcontractor, then after-the-fact quotations may be obtained by the Owner's <br /> Representative from the open market in the vicinity and the lowest such quotation may be <br /> used in place of the submitted invoice. <br /> B. Except as noted below, the Owner will pay the Contractor an additional twenty-one (21) percent <br /> of the sum of the costs included on invoices for specialized services to cover project Overhead, <br /> general company Overhead, profit, bonding, insurance, Business & Occupation tax, and other <br /> costs incurred. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 007213 -48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.