Laserfiche WebLink
e. The Contractor shall include the provisions of paragraphs (a) through (e) in every <br /> subcontract, including contracts for procurement and leases of equipment, unless <br /> exempt by applicable federal regulations or directives issued pursuant thereto. The <br /> Contractor shall take such action, including sanctions for noncompliance, with respect <br /> to any Subcontractor as the Owner or relevant federal agency may direct so as to <br /> enforce such provisions. Provided, however, in the event a Contractor becomes <br /> involved in, or is threatened with, litigation with a Subcontractor or Supplier as a result <br /> of the foregoing direction, the Contractor may request that the Owner or the United <br /> States to enter into such litigation to protect their respective interests. <br /> 18.8 Complete Agreement <br /> A. These Contract Documents contain the complete and integrated understanding and agreement <br /> between the parties and supersedes any understanding, agreement or negotiation, whether oral or <br /> written,not set forth herein. <br /> 18.9 Successors Bound <br /> A. The grants, covenants, provisions and claims, rights, powers, privileges and liabilities contained <br /> in the Contract Documents shall be read and held as made by and with, and granted to and <br /> imposed upon, the Contractor and the Owner and their respective heirs, executors, administrators, <br /> successors and assigns. <br /> 18.10 Effective Date <br /> A. When duly executed by both the Owner and Contractor, this Contract shall be effective as of the <br /> date the Contract is signed by the Mayor of the City of Everett. <br /> 18.11 Contractor Registration <br /> A. Contractor represents and warrants it is a contractor duly registered and in good standing with the <br /> Washington State Department of Labor and Industries. <br /> END OF DOCUMENT 007213 <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 007213 - 72 <br />