Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> SECTION 011100—SUMMARY OF WORK <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Section includes: <br /> 1. Project information. <br /> 2. Work covered by Contract Documents. <br /> 3. Work by Owner. <br /> 4. Work under separate contracts. <br /> 5. Future work. <br /> 6. Access to site. <br /> 7. Coordination with occupants. <br /> 8. Work restrictions. <br /> 9. Specification and drawing conventions. <br /> B. Related Section: <br /> 1. Section 01 50 00 — Temporary Facilities and Controls for limitations and procedures <br /> governing temporary use of the Owner's facilities. <br /> 1.2 PROJECT INFORMATION <br /> A. Project Identification: Water Filtration Plant(WFP) Operations Building Seismic Retrofit <br /> 1. Project Location: Everett Water Filtration Plant, 6133 Lake Chaplain Road, Monroe, WA <br /> 98272 <br /> B. Owner: City of Everett Public Works Department, Richard Hefti, Project Engineer, (425) 257- <br /> 7215,rhefti@everettwa.gov. <br /> C. Engineer: AECOM, Kerry Fearington, Project Manager, (503) 948-7257, <br /> kerry.fearington@aecom.com. <br /> 1.3 WORK COVERED BY CONTRACT DOCUMENTS <br /> A. Scope <br /> 1. This project provides a voluntary seismic retrofit of the City of Everett's WFP Operations <br /> Building at the Chaplain Reservoir near Monroe, Washington. The voluntary seismic <br /> retrofit is limited primarily to the original 1980s portion of the WFP Operations Building <br /> and includes both structural and nonstructural measures for this facility. The stair tower <br /> structure at the southwest corner and office addition at the southeast portion of the <br /> Operations Building are separate structures that were added in the 1990s and are not <br /> included in this retrofit. Retrofit measures are indicated on the project drawings and <br /> include,but are not limited to the following: <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 011100 - 1 <br />