Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> F. Controlled Substances: Use of tobacco products and other controlled substances are not <br /> permitted on the Owner's property. <br /> G. Employee Identification: The Owner will provide passes for Contractor personnel working on <br /> the Project site. Contractor personnel must display their passes at all times. Upon the start of <br /> each work day, the Contractor's foreman or crew leader can sign in for the crew at the front <br /> desk sign-in sheet. <br /> 1.8 SPECIFICATION AND DRAWING CONVENTIONS <br /> A. Specification Content: The Specifications use certain conventions for the style of language and <br /> the intended meaning of certain terms, words, and phrases when used in particular situations. <br /> These conventions are as follows: <br /> 1. Imperative mood and streamlined language are generally used in the Specifications. The <br /> words "shall," "shall be," or "shall comply with," depending on the context, are implied <br /> where a colon(:)is used within a sentence or phrase. <br /> 2. Specification requirements are to be performed by the Contractor unless specifically <br /> stated otherwise. <br /> B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work <br /> of all Sections in the Specifications. <br /> C. Drawing Coordination: Requirements for materials and products identified on the Drawings are <br /> described in detail in the Specifications. One or more of the following are used on the Drawings <br /> to identify materials and products: <br /> 1. Terminology: Materials and products are identified by the typical generic terms used in <br /> the individual Specifications Sections. <br /> 2. Abbreviations: Materials and products are identified by abbreviations published as part of <br /> the U.S. National CAD Standard and scheduled on Drawings. <br /> 3. Keynoting: Materials and products are identified by reference keynotes referencing <br /> Specification Section numbers found in this Project Manual. <br /> PART 2 -PRODUCTS (Not Used) <br /> PART 3 -EXECUTION(Not Used) <br /> END OF SECTION 011100 <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 011100-4 <br />