My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> F. Controlled Substances: Use of tobacco products and other controlled substances are not <br /> permitted on the Owner's property. <br /> G. Employee Identification: The Owner will provide passes for Contractor personnel working on <br /> the Project site. Contractor personnel must display their passes at all times. Upon the start of <br /> each work day, the Contractor's foreman or crew leader can sign in for the crew at the front <br /> desk sign-in sheet. <br /> 1.8 SPECIFICATION AND DRAWING CONVENTIONS <br /> A. Specification Content: The Specifications use certain conventions for the style of language and <br /> the intended meaning of certain terms, words, and phrases when used in particular situations. <br /> These conventions are as follows: <br /> 1. Imperative mood and streamlined language are generally used in the Specifications. The <br /> words "shall," "shall be," or "shall comply with," depending on the context, are implied <br /> where a colon(:)is used within a sentence or phrase. <br /> 2. Specification requirements are to be performed by the Contractor unless specifically <br /> stated otherwise. <br /> B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work <br /> of all Sections in the Specifications. <br /> C. Drawing Coordination: Requirements for materials and products identified on the Drawings are <br /> described in detail in the Specifications. One or more of the following are used on the Drawings <br /> to identify materials and products: <br /> 1. Terminology: Materials and products are identified by the typical generic terms used in <br /> the individual Specifications Sections. <br /> 2. Abbreviations: Materials and products are identified by abbreviations published as part of <br /> the U.S. National CAD Standard and scheduled on Drawings. <br /> 3. Keynoting: Materials and products are identified by reference keynotes referencing <br /> Specification Section numbers found in this Project Manual. <br /> PART 2 -PRODUCTS (Not Used) <br /> PART 3 -EXECUTION(Not Used) <br /> END OF SECTION 011100 <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 011100-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.