My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.'. CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> SECTION 011400—WORK RESTRICTIONS <br /> PART 1 —GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. Conditions relating to: <br /> 1. Access to construction site. <br /> 2. Contractor's storage/yarding area. <br /> 3. Contractor's employee parking. <br /> 4. Haul routes. <br /> 1.2 RELATED SECTIONS <br /> A. Section 01 50 00—Temporary Facilities and Controls. <br /> B. Section 01 74 19—Construction Waste Management and Disposal. <br /> PART 2—PRODUCTS (Not Used) <br /> PART 3 —EXECUTION <br /> 3.1 SITE ACCESS <br /> A. Motorized and foot access to the site shall be through the main gate of the WFP facility. The <br /> gate is open 6:00 am to 6:00 pm, Monday — Friday. The Owner will provide the Contractor <br /> with a pass key or code to allow access through the main gate to the facility. <br /> B. Contractor deliveries must use the main gate Monday through Friday during the hours of 6:00 <br /> a.m. to 3:00 p.m. <br /> 3.2 STORAGE/YARDING <br /> A. Confine storage/yarding to the areas shown the Contract Drawings (Drawing No G-001). <br /> Provide necessary barricades and fences. <br /> B. Equipment/vehicles: Park in areas as shown on the Contract Drawings (Drawing No. G-001) <br /> or as directed by the Owner at the preconstruction meeting. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 011400 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.