Laserfiche WebLink
DRAFT SUBMITTAL REGISTER <br /> WFP OPERATIONS BUILDING SEISMIC RETROFIT <br /> CONTRACTOR PROJECT NO. <br /> CONTRACTOR: <br /> Submittal Dates <br /> Submittal Reference <br /> Actual Required Actual Approval <br /> Number Section Part Type' Description' Responsible Party Scheduled Submittal Submittal Response Response Disposition date <br /> Notes: <br /> 1.Type of submittals are Certification,Documentation,Drawings,Shop Drawings,Schedule,Samples,Test Results,and Notification. <br /> 2.Refer to Technical Specifications for details of required submittals listed. <br /> Page 1 of <br />