Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> D. Unless otherwise specified, submit three samples of each required item, one to be retained on <br /> site by the Owner's Representative. <br /> E. Reviewed samples that may be used in the Work are indicated in individual specification <br /> sections. <br /> 1.9 MANUFACTURER'S INSTRUCTIONS <br /> A. When specified in individual specification sections, submit manufacturer's printed instructions <br /> for delivery, storage, assembly, installation, startup, adjustment, and finishing. Provide in <br /> quantities specified for Product Data. <br /> B. Identify conflicts between manufacturer's instructions and Contract Documents on submittal. <br /> 1.10 CONTRACT CLOSEOUT <br /> A. Submit in accordance with Conditions of the Contract. <br /> 1.11 MANUFACTURER'S CERTIFICATES <br /> A. When specified in individual specification sections, submit manufacturer's certificate to the <br /> Owner's Representative for review. Provide quantities specified for Product Data. <br /> B. Indicate that material or product conforms to or exceeds specified requirements. Submit <br /> supporting reference data, affidavits, and certifications as appropriate. <br /> C. Certificates may be recent or previous test results on material or product, as acceptable to the <br /> Owner's Representative. <br /> 1.12 LIST OF SUBCONTRACTORS <br /> A. Submit as required in Conditions of the Contract. <br /> 1.13 MISCELLANEOUS <br /> A. Submit information required as a condition of the Building Permit issued by code authority. <br /> 1.14 SUBMITTALS REGISTER <br /> A. The Contractor shall review the entire contract document and develop a Draft Submittal <br /> Register and submit to the Owner's Representative within five working days of notice to <br /> proceed (NTP). A submittal register template is attached at the end of this section for the <br /> Contractor's use. <br /> B. The Contractor shall update the Submittal Register throughout the duration of the project. <br /> END OF SECTION 013300 <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 013300 - 3 <br />