My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> D. Unless otherwise specified, submit three samples of each required item, one to be retained on <br /> site by the Owner's Representative. <br /> E. Reviewed samples that may be used in the Work are indicated in individual specification <br /> sections. <br /> 1.9 MANUFACTURER'S INSTRUCTIONS <br /> A. When specified in individual specification sections, submit manufacturer's printed instructions <br /> for delivery, storage, assembly, installation, startup, adjustment, and finishing. Provide in <br /> quantities specified for Product Data. <br /> B. Identify conflicts between manufacturer's instructions and Contract Documents on submittal. <br /> 1.10 CONTRACT CLOSEOUT <br /> A. Submit in accordance with Conditions of the Contract. <br /> 1.11 MANUFACTURER'S CERTIFICATES <br /> A. When specified in individual specification sections, submit manufacturer's certificate to the <br /> Owner's Representative for review. Provide quantities specified for Product Data. <br /> B. Indicate that material or product conforms to or exceeds specified requirements. Submit <br /> supporting reference data, affidavits, and certifications as appropriate. <br /> C. Certificates may be recent or previous test results on material or product, as acceptable to the <br /> Owner's Representative. <br /> 1.12 LIST OF SUBCONTRACTORS <br /> A. Submit as required in Conditions of the Contract. <br /> 1.13 MISCELLANEOUS <br /> A. Submit information required as a condition of the Building Permit issued by code authority. <br /> 1.14 SUBMITTALS REGISTER <br /> A. The Contractor shall review the entire contract document and develop a Draft Submittal <br /> Register and submit to the Owner's Representative within five working days of notice to <br /> proceed (NTP). A submittal register template is attached at the end of this section for the <br /> Contractor's use. <br /> B. The Contractor shall update the Submittal Register throughout the duration of the project. <br /> END OF SECTION 013300 <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 013300 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.